Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 9.1
edited by Alexander Mott
on 2023/12/12 16:31
on 2023/12/12 16:31
Change comment:
There is no comment for this version
To version 2.1
edited by Alexander Mott
on 2022/06/22 19:51
on 2022/06/22 19:51
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,51 +1,38 @@ 1 -This is a broad-strokes checklist for what needs to be completed by a technician for a S howRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.1 +This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step. 2 2 3 -More detailed specifics and troubleshooting information are available in the [[S howRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].3 +More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]]. 4 4 5 5 Startup Checklist: 6 6 7 7 * Before arriving on-site: 8 8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] 9 -** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide. Preparation.Site Readiness Checklist.WebHome]]9 +** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]] 10 10 * Once on-site: 11 -** Configure authentication settings for networked devices 12 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 13 -** Configure clock and time zone for processors 14 -** Update firmware for all networked devices (excluding Zūm Net devices) 15 -** Load ShowRunnerCLC™ program, license, and configuration file to the processor 16 -** Load the ShowRunnerCLC™ UI to any touchscreens 17 -** Load the ShowRunnerCLC™ expansion program to any GLPACs 18 -** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 19 -*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it 20 -** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox 21 -** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™ 22 -*** If necessary, update firmware for any Cresnet and RFID devices 23 -** Update firmware for Zūm Net devices 24 -*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes 11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.) 12 +** Configure clock and timezone for processors 13 +** Update firmware for all networked devices 14 +** If necessary, update firmware for Zūm Net and Cresnet devices 15 +** Load SHOWRUNNER™ program to the processor 16 +** Load the SHOWRUNNER™ UI to any touchscreens 17 +** Load the SHOWRUNNER™ expansion program to any GLPACs 18 +** Poll Cresnet and verify devices are online in Toolbox 19 +** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™ 25 25 ** Verify load schedule and fixture functionality 26 -*** Toggle each load individually and verify they dim and switch correctly 27 27 *** Verify loads are assigned to correct areas 22 +*** Verify loads dim and switch correctly 28 28 *** Assign friendly load labels as necessary 29 -*** Use the "Verification" checkbox to add a verified timestamp to the load 30 30 ** Verify occupancy sensors 31 31 *** Verify correct area assignments 32 -*** Verify correct direct load assignments if necessary 33 33 *** Adjust timeouts and sensitivities as necessary 34 34 ** Verify keypad functionality 35 35 *** Verify correct area assignments 36 36 *** Verify correct button layouts and functionality 37 -*** Configure keypad actions as necessary 38 38 ** Verify photocell functionality 39 -*** Verify photocells respond to changes in light levels 40 40 *** Assign photocells to appropriate lighting zones and enable for required scenes 41 41 *** Adjust sensitivity as necessary 42 42 ** Verify partition sensor functionality 43 43 *** Verify correct area assignments 44 -*** Adjust sensitivity as required for consistent partition detection 45 -** Configure Area-level sequence of operations 46 -*** Occupancy/vacancy mode 47 -*** Occupied/vacant scenes 48 -*** Scene levels 35 +*** Adjust sensitivity as required 49 49 ** Set up any schedules as required per the sequence of operations 50 50 ** Complete functionality test (QC, make sure each room functions from an end-user perspective) 51 51 ** End-user training