Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 2.1
edited by Alexander Mott
on 2022/06/22 19:51
on 2022/06/22 19:51
Change comment:
There is no comment for this version
To version 4.1
edited by Alexander Mott
on 2022/06/22 21:29
on 2022/06/22 21:29
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -6,15 +6,16 @@ 6 6 7 7 * Before arriving on-site: 8 8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] 9 -** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]] 9 +** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]] 10 10 * Once on-site: 11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.) 11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 12 12 ** Configure clock and timezone for processors 13 13 ** Update firmware for all networked devices 14 14 ** If necessary, update firmware for Zūm Net and Cresnet devices 15 -** Load SHOWRUNNER™ program to the processor 15 +** Load SHOWRUNNER™ program, license, and configuration file to the processor 16 16 ** Load the SHOWRUNNER™ UI to any touchscreens 17 17 ** Load the SHOWRUNNER™ expansion program to any GLPACs 18 +** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 18 18 ** Poll Cresnet and verify devices are online in Toolbox 19 19 ** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™ 20 20 ** Verify load schedule and fixture functionality