Changes for page Startup Checklist

Last modified by Alexander Mott on 2024/12/02 19:09

From version 2.1
edited by Alexander Mott
on 2022/06/22 19:51
Change comment: There is no comment for this version
To version 4.1
edited by Alexander Mott
on 2022/06/22 21:29
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -6,15 +6,16 @@
6 6  
7 7  * Before arriving on-site:
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 -** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]]
9 +** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
12 12  ** Configure clock and timezone for processors
13 13  ** Update firmware for all networked devices
14 14  ** If necessary, update firmware for Zūm Net and Cresnet devices
15 -** Load SHOWRUNNER™ program to the processor
15 +** Load SHOWRUNNER™ program, license, and configuration file to the processor
16 16  ** Load the SHOWRUNNER™ UI to any touchscreens
17 17  ** Load the SHOWRUNNER™ expansion program to any GLPACs
18 +** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
18 18  ** Poll Cresnet and verify devices are online in Toolbox
19 19  ** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™
20 20  ** Verify load schedule and fixture functionality