Wiki source code of Crestron Zūm Wired
Version 5.1 by Mark Kohlmann on 2021/05/05 22:39
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | Crestron Zūm Wired is a locally integrated lighting control system with various global control options. Zūm rooms are self-contained control units with primary logic occurring at the room level. Central control systems offer scheduling and management. SHOWRUNNER™ provides a number of integrations options that allow the designer to optimize the solution design. | ||
| 2 | |||
| 3 | ~*~*~* Specifications are preliminary, the Zūm wired ZUM-FLOOR-HUB has not been released ~*~** | ||
| 4 | |||
| 5 | ==== Integration Options ==== | ||
| 6 | |||
| 7 | * **SHOWRUNNER™ Total Control** - The most comprehensive option. Allows seamless integration of Zūm and non-Zūm Crestron lighting control products. Extensive feature set allows centralized control and management of Zūm rooms. Advanced scheduler provides more flexibility to the facility operator. This solution replaces the ZUM-FLOOR-HUB in the system design. | ||
| 8 | * **SHOWRUNNER™ + ZUM-FLOOR-HUB** - Provides limited scene recall and room status for Zūm rooms paired with the Floor Hub. SHOWRUNNER™ can export its own areas to the Floor Hub. | ||
| 9 | |||
| 10 | ==== Feature Matrix ==== | ||
| 11 | |||
| 12 | |=Feature|=SHOWRUNNER™ Total Control|=SHOWRUNNER™ (External Room Export) + ZUM-FLOOR-HUB (Mirror Driver)|=ZUM-FLOOR-HUB Only|=Zūm iOS/Android Setup App* | ||
| 13 | |(% colspan="5" %)**Hardware Requirements** | ||
| 14 | |Requires ZUMNET JBox|Y|Y|Y|N | ||
| 15 | |Requires 3 or 4-Series Control System|Y|Y|N|N/A | ||
| 16 | |Requires Physical Presence in Room to Change Scenes|N|TBD|TBD|Y | ||
| 17 | |(% colspan="5" %)**User Interfaces** | ||
| 18 | |Web Browser|((( | ||
| 19 | Crestron SmartGraphics XPanel | ||
| 20 | HTML5 UI | ||
| 21 | )))|SHOWRUNNER™ - Crestron SmartGraphics XPanel | ||
| 22 | ZUM-FLOOR-HUB - HTML5 UI|HTML5 UI|N | ||
| 23 | |iOS/Android|Y, Crestron App (Paid Upgrade)|Y, Crestron App (Paid Upgrade), Limited Features for Zūm Rooms|N|Y* | ||
| 24 | |Touchscreens (Crestron TSW series)|Y|Y, Limited Features for Zūm Rooms|N|N | ||
| 25 | |(% colspan="5" %)**Features** | ||
| 26 | |Scene Recall|Y|Y|Y|Y | ||
| 27 | |Override Fade Time for Scene Recall|Y|TBD|TBD|TBD | ||
| 28 | |Scene Save|Y|TBD|TBD|Y | ||
| 29 | |Load Control|Y|TBD|TBD|Y | ||
| 30 | |Demand Response|Y|Y, separate triggers for SHOWRUNNER™ and ZUM-FLOOR-HUB required|Y|N | ||
| 31 | |Enable/Disable Occupancy|Y|Y, from Floor Hub|Y|Y | ||
| 32 | |Override Occupancy Logic|Y|TBD|TBD|N | ||
| 33 | |Override|Y|Scene Recall only via ShowRunner|TBD|N/A | ||
| 34 | |Plug Load On/Off|Y|Y|Y|By Hardware | ||
| 35 | |Integration with Non-Zūm Crestron Hardware|Y|N|N|N | ||
| 36 | |Custom Zūm Keypad Programming|Y|TBD|TBD|Y, within the limits of the hardware | ||
| 37 | |New Feature Release Cycle|Aggressive|SHOWRUNNER™: Aggressive | ||
| 38 | Floor Hub: 6-12 months|6-12 months|6-12 months | ||
| 39 | |Room Organization|((( | ||
| 40 | Organize According to Defined Nodes, multiple levels | ||
| 41 | Categorization to Filter by Tag | ||
| 42 | )))|SHOWRUNNER™: See SHOWRUNNER™ Total Control | ||
| 43 | Floor Hub: Category/Room|Category/Room|((( | ||
| 44 | N/A | ||
| 45 | ))) | ||
| 46 | |Room Discovery|Automatic Discovery of ZUMNET and ZUMLINK devices|SHOWRUNNER™: Automatic discovery | ||
| 47 | Floor Hub: Map Mirrored Rooms to SHOWRUNNER™ and Discovery External Rooms|Automatic Discovery of ZUMNET and ZUMLINK devices|N/A | ||
| 48 | |Network Topology|((( | ||
| 49 | * Flat | ||
| 50 | * Single Handoff to LAN w/ Control Subnet | ||
| 51 | (Requires CP3N/CP4N/AV3/AV4/PRO3/PRO4) | ||
| 52 | )))|Single Handoff to LAN w/ Control Subnet. ShowRunner can be on LAN or Control Subnet|Single Handoff to LAN w/ Control Subnet|N/A | ||
| 53 | |Network Addressing|((( | ||
| 54 | * Manual | ||
| 55 | * Customer | ||
| 56 | * Control Subnet (Requires CP3N/CP4N/AV3/AV4/PRO3/PRO4) | ||
| 57 | )))|Control Subnet|Control Subnet|N/A | ||
| 58 | |Firmware Updates|PUF Tool | ||
| 59 | Automatic Support on Roadmap|SHOWRUNNER™: PUF Tool | ||
| 60 | Floor Hub: Automatic, Internet Connection Required|Automatic, Internet Connection Required|N/A | ||
| 61 | |(% colspan="5" %)**Calendar/Scheduling** | ||
| 62 | |Logic Type|Event Driven | ||
| 63 | Profile Support (Under Development)|SHOWRUNNER™: Event Driven | ||
| 64 | Floor Hub: Pattern assigned to Category|Pattern assigned to Category|N/A | ||
| 65 | |Astronomical Clock|Y|Y, Per Category|Y, Per Category|N/A | ||
| 66 | |Holidays|Pattern|SHOWRUNNER™: Pattern | ||
| 67 | Floor Hub: Hard Coded|Hard Coded|N/A | ||
| 68 | |Custom Patterns|Y, Advanced Scheduler License|SHOWRUNNER™: Y, Advanced Scheduler License | ||
| 69 | Floor Hub: N|N|N/A | ||
| 70 | |(% colspan="5" %)**Integrations** | ||
| 71 | |A/V Integration: API|Y|SHOWRUNNER™: Y | ||
| 72 | Floor Hub: Limited|Limited|N/A | ||
| 73 | |A/V Integration: Crestron EISC|Y|SHOWRUNNER™: Y | ||
| 74 | Floor Hub: N|N|N/A | ||
| 75 | |A/V Integration: RS-232|Y|((( | ||
| 76 | SHOWRUNNER™: Y | ||
| 77 | Floor Hub: AVBRIDGE per Area | ||
| 78 | )))|AVBRIDGE per Area|N/A | ||
| 79 | |BACNET|Y, SHOWRUNNER™ and Crestron Licenses Needed|((( | ||
| 80 | SHOWRUNNER™: SHOWRUNNER™ and Crestron Licenses Needed | ||
| 81 | Floor Hub: Y | ||
| 82 | )))|Y|N/A | ||
| 83 | |BACNET Features|((( | ||
| 84 | Per Area Status: | ||
| 85 | Active Scene | ||
| 86 | Occupied | ||
| 87 | Occupancy Enabled | ||
| 88 | Individual Load Level | ||
| 89 | Photocell Level (per Photocell) | ||
| 90 | Plug Loads Enabled | ||
| 91 | |||
| 92 | System: | ||
| 93 | Demand Response Enabled | ||
| 94 | System Wide Override (Panic/Emergency) | ||
| 95 | |||
| 96 | ~* More Features added upon request | ||
| 97 | )))|((( | ||
| 98 | SHOWRUNNER™: See list for SHOWRUNNER™ Total Control | ||
| 99 | Floor Hub: See list for ZUM-FLOOR-HUB | ||
| 100 | )))|((( | ||
| 101 | Per Room Status: | ||
| 102 | Online | ||
| 103 | On | ||
| 104 | Occupied | ||
| 105 | Daylighting Active | ||
| 106 | Device Battery is Low | ||
| 107 | Plug Loads Enabled | ||
| 108 | Occupancy Sensor Enabled | ||
| 109 | Current Daylight Level | ||
| 110 | Active Scene | ||
| 111 | \\System: | ||
| 112 | Demand Response Enabled | ||
| 113 | )))|N/A | ||
| 114 | |BACNET Settings Scope | ||
| 115 | (What Points are Exposed)|Per Area|((( | ||
| 116 | SHOWRUNNER™: Per Area | ||
| 117 | Floor Hub: Global | ||
| 118 | )))|Global|N/A | ||
| 119 | |BACNET Points Supported|Depends on Crestron License and Hardware|SHOWRUNNER™: Depends on Crestron License and Hardware | ||
| 120 | Floor Hub: 1000|1000|N/A | ||
| 121 | |Crestron Fusion|Y|((( | ||
| 122 | SHOWRUNNER™: Y | ||
| 123 | Floor Hub: N | ||
| 124 | )))|N|N/A | ||
| 125 | |Export to Zūm Floor Hub|Y, Licensed|SHOWRUNNER™: Y, Licensed|N/A|N/A | ||
| 126 | |GLPAC|Y|SHOWRUNNER™: Y | ||
| 127 | Floor Hub: Via SHOWRUNNER™|N|N/A | ||
| 128 | |System to System Link|Y|((( | ||
| 129 | SHOWRUNNER™: Y | ||
| 130 | Floor Hub: N | ||
| 131 | )))|N|N/A | ||
| 132 | |Minimum ZUM-NET Firmware|ZUM-WIRED 1.00.08 puf|N/A|See Crestron|See Crestron | ||
| 133 | |Minimum SHOWRUNNER™ Version|2.208|N/A|N/A|N/A | ||
| 134 | |||
| 135 | {{id name="caveats"/}} | ||
| 136 | |||
| 137 | ==== Caveats ==== | ||
| 138 | |||
| 139 | * Consult Chief Integrations to verify sequence of operations if there are any concerns. | ||
| 140 | * Additional caveats TBD | ||
| 141 | |||
| 142 | ==== Topologies ==== | ||
| 143 | |||
| 144 | **SHOWRUNNER™ Total Control** | ||
| 145 | [[image:ZumSr\@2x.png||alt="Zum SHOWRUNNER™ Total Control Topology"]] | ||
| 146 | |||
| 147 | **SHOWRUNNER™ (External Room Export) + ZUM-FLOOR-HUB (Mirror Driver)** | ||
| 148 | [[image:ZumFhSr\@2x.png||alt="Zum Floor Hub + SHOWRUNNER™ Topology"]] | ||