Changes for page Crestron Zūm Wired
Last modified by Scott Kohlmann on 2023/04/20 22:22
From version 9.1
edited by Mark Kohlmann
on 2021/05/05 22:42
on 2021/05/05 22:42
Change comment:
There is no comment for this version
To version 10.1
edited by Mark Kohlmann
on 2021/05/06 15:18
on 2021/05/06 15:18
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -14,6 +14,7 @@ 14 14 |Requires ZUMNET JBox|Y|Y|Y|N 15 15 |Requires 3 or 4-Series Control System|Y|Y|N|N/A 16 16 |Requires Physical Presence in Room to Change Scenes|N|TBD|TBD|Y 17 +|Maximum Rooms|TBD|1000|1000|N/A 17 17 |(% colspan="5" %)**User Interfaces** 18 18 |Web Browser|((( 19 19 Crestron SmartGraphics XPanel ... ... @@ -139,6 +139,17 @@ 139 139 * Consult Chief Integrations to verify sequence of operations if there are any concerns. 140 140 * Additional caveats TBD 141 141 143 +==== FAQ: ==== 144 + 145 +* I want to have a single connection to the building and have all of my Crestron devices on the Control Subnet (same topology as a ZUM-FLOOR-HUB) and use ShowRunner™ Total Control? 146 +//Use a CP4N in lieu of the ZUM-FLOOR-HUB. A DIN-AP4 is not required.// 147 +* Do I need a Crestron BACnet license when using ShowRunner for BACnet integration? 148 +//If over 50 BACnet points are needed then a license (SW-3SERIES-BACNET-50+) will be needed for each Crestron processor that will provide BACnet points to the BMS.// 149 + 150 +(% class="wikigeneratedid" %) 151 +==== ==== 152 + 153 +(% class="wikigeneratedid" %) 142 142 ==== Topologies ==== 143 143 144 144 **SHOWRUNNER™ Total Control (Control Subnet or Flat)**