Changes for page Crestron Zūm Wired
Last modified by Scott Kohlmann on 2023/04/20 22:22
From version 12.1
edited by Mark Kohlmann
on 2021/05/06 15:19
on 2021/05/06 15:19
Change comment:
There is no comment for this version
To version 7.1
edited by Mark Kohlmann
on 2021/05/05 22:42
on 2021/05/05 22:42
Change comment:
Uploaded new attachment "ZumWired_FH@2x.png", version {1}
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -14,7 +14,6 @@ 14 14 |Requires ZUMNET JBox|Y|Y|Y|N 15 15 |Requires 3 or 4-Series Control System|Y|Y|N|N/A 16 16 |Requires Physical Presence in Room to Change Scenes|N|TBD|TBD|Y 17 -|Maximum Rooms|TBD|1000|1000|N/A 18 18 |(% colspan="5" %)**User Interfaces** 19 19 |Web Browser|((( 20 20 Crestron SmartGraphics XPanel ... ... @@ -49,18 +49,16 @@ 49 49 |Network Topology|((( 50 50 * Flat 51 51 * Single Handoff to LAN w/ Control Subnet 52 -(Requires CP4N/AV4/PRO4) 51 +(Requires CP3N/CP4N/AV3/AV4/PRO3/PRO4) 53 53 )))|Single Handoff to LAN w/ Control Subnet. ShowRunner can be on LAN or Control Subnet|Single Handoff to LAN w/ Control Subnet|N/A 54 54 |Network Addressing|((( 55 55 * Manual 56 -* Customer (DHCP or Manual)57 -* DHCP: Control Subnet (Requires CP4N/AV4/PRO4)55 +* Customer 56 +* Control Subnet (Requires CP3N/CP4N/AV3/AV4/PRO3/PRO4) 58 58 )))|Control Subnet|Control Subnet|N/A 59 59 |Firmware Updates|PUF Tool 60 60 Automatic Support on Roadmap|SHOWRUNNER™: PUF Tool 61 61 Floor Hub: Automatic, Internet Connection Required|Automatic, Internet Connection Required|N/A 62 -|Floorplans|Y|SHOWRUNNER™: Y 63 -Floor Hub: N|N|N/A 64 64 |(% colspan="5" %)**Calendar/Scheduling** 65 65 |Logic Type|Event Driven 66 66 Profile Support (Under Development)|SHOWRUNNER™: Event Driven ... ... @@ -77,8 +77,8 @@ 77 77 Floor Hub: N|N|N/A 78 78 |A/V Integration: RS-232|Y|((( 79 79 SHOWRUNNER™: Y 80 -Floor Hub: TBD81 -)))| TBD|N/A77 +Floor Hub: AVBRIDGE per Area 78 +)))|AVBRIDGE per Area|N/A 82 82 |BACNET|Y, SHOWRUNNER™ and Crestron Licenses Needed|((( 83 83 SHOWRUNNER™: SHOWRUNNER™ and Crestron Licenses Needed 84 84 Floor Hub: Y ... ... @@ -142,22 +142,14 @@ 142 142 * Consult Chief Integrations to verify sequence of operations if there are any concerns. 143 143 * Additional caveats TBD 144 144 145 -==== FAQ: ==== 146 - 147 -* I want to have a single connection to the building and have all of my Crestron devices on the Control Subnet (same topology as a ZUM-FLOOR-HUB) and use ShowRunner™ Total Control? 148 -//Use a CP4N in lieu of the ZUM-FLOOR-HUB. A DIN-AP4 is not required.// 149 -* Do I need a Crestron BACnet license when using ShowRunner for BACnet integration? 150 -//If over 50 BACnet points are needed then a license (SW-3SERIES-BACNET-50+) will be needed for each Crestron processor that will provide BACnet points to the BMS.// 151 - 152 -==== ==== 153 - 154 154 ==== Topologies ==== 155 155 156 -**SHOWRUNNER™ Total Control (Control Subnet or Flat)**157 -[[image:Zum Wired_SR-CS\@2x.png||alt="Zum SHOWRUNNER™ Total Control TopologyControl Subnet"]][[image:ZumWired_SR-Flat\@2x.png||alt="Flat Topology"]]144 +**SHOWRUNNER™ Total Control** 145 +[[image:ZumSr\@2x.png||alt="Zum SHOWRUNNER™ Total Control Topology"]] 158 158 159 159 **SHOWRUNNER™ (External Room Export) + ZUM-FLOOR-HUB (Mirror Driver)** 160 -[[image:Zum Wired_SRtoFH\@2x.png||alt="Zum Floor Hub + SHOWRUNNER™ Topology"]]148 +[[image:ZumFhSr\@2x.png||alt="Zum Floor Hub + SHOWRUNNER™ Topology"]] 161 161 162 162 **ZUM-FLOOR-HUB Only** 163 -[[image:ZumWired_FH\@2x.png||alt="Zum Floor Hub Only"]] 151 + 152 +