... ... @@ -14,7 +14,6 @@
14 14  |Requires ZUMNET JBox|Y|Y|Y|N
15 15  |Requires 3 or 4-Series Control System|Y|Y|N|N/A
16 16  |Requires Physical Presence in Room to Change Scenes|N|TBD|TBD|Y
17 -|Maximum Rooms|TBD|1000|1000|N/A
18 18  |(% colspan="5" %)**User Interfaces**
19 19  |Web Browser|(((
20 20  Crestron SmartGraphics XPanel
... ... @@ -49,18 +49,16 @@
49 49  |Network Topology|(((
50 50  * Flat
51 51  * Single Handoff to LAN w/ Control Subnet
52 -(Requires  CP4N/AV4/PRO4)
51 +(Requires  CP3N/CP4N/AV3/AV4/PRO3/PRO4)
53 53  )))|Single Handoff to LAN w/ Control Subnet.  ShowRunner can be on LAN or Control Subnet|Single Handoff to LAN w/ Control Subnet|N/A
54 54  |Network Addressing|(((
55 55  * Manual
56 -* Customer (DHCP or Manual)
57 -* DHCP: Control Subnet (Requires CP4N/AV4/PRO4)
55 +* Customer
56 +* Control Subnet (Requires CP3N/CP4N/AV3/AV4/PRO3/PRO4)
58 58  )))|Control Subnet|Control Subnet|N/A
59 59  |Firmware Updates|PUF Tool
60 60  Automatic Support on Roadmap|SHOWRUNNER™: PUF Tool
61 61  Floor Hub: Automatic, Internet Connection Required|Automatic, Internet Connection Required|N/A
62 -|Floorplans|Y|SHOWRUNNER™: Y
63 -Floor Hub: N|N|N/A
64 64  |(% colspan="5" %)**Calendar/Scheduling**
65 65  |Logic Type|Event Driven
66 66  Profile Support (Under Development)|SHOWRUNNER™: Event Driven
... ... @@ -142,15 +142,6 @@
142 142  * Consult Chief Integrations to verify sequence of operations if there are any concerns.
143 143  * Additional caveats TBD
144 144  
145 -==== FAQ: ====
146 -
147 -* I want to have a single connection to the building and have all of my Crestron devices on the Control Subnet (same topology as a ZUM-FLOOR-HUB) and use ShowRunner™ Total Control?
148 -//Use a CP4N in lieu of the ZUM-FLOOR-HUB.  A DIN-AP4 is not required.//
149 -* Do I need a Crestron BACnet license when using ShowRunner for BACnet integration?
150 -//If over 50 BACnet points are needed then a license (SW-3SERIES-BACNET-50+) will be needed for each Crestron processor that will provide BACnet points to the BMS.//
151 -
152 -==== ====
153 -
154 154  ==== Topologies ====
155 155  
156 156  **SHOWRUNNER™ Total Control (Control Subnet or Flat)**