Last modified by Alexander Mott on 2024/03/01 18:46

From version 76.1
edited by Alexander Mott
on 2024/01/05 19:02
Change comment: Renamed back-links.
To version 77.1
edited by Alexander Mott
on 2024/01/05 19:41
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -37,8 +37,6 @@
37 37  
38 38  Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a room to the ZUMNET-JBOX for that room. Zūm Link cable is shown in orange on //[[Figure 1>>WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm Net devices. Additionally, **do not loop Zūm Link runs back to a Zūm Net device**; each Zūm Link run should originate at an orange Zūm Link port on a Zūm Net device and end at the last Zūm Link device on the run.
39 39  
40 -Links to articles covering specific Zūm Link devices can be found [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.WebHome]].
41 -
42 42  == Zūm Link to Cresnet ==
43 43  
44 44  While most Zūm Link wiring will adhere to Ethernet cabling standards and utilize standard RJ-45 connectors, Zūm Link is not technically Ethernet. In some situations, it may be necessary to wire traditional Cresnet devices into a Zūm Link space.