Changes for page Zūm Wired Wiring Overview
Last modified by Alexander Mott on 2024/03/01 18:46
From version 63.1
edited by Alexander Mott
on 2023/10/13 16:14
on 2023/10/13 16:14
Change comment:
There is no comment for this version
To version 67.1
edited by Alexander Mott
on 2024/01/05 18:46
on 2024/01/05 18:46
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,4 +2,3 @@ 1 - 2 2 (% class="row" %) 3 3 ((( 4 4 (% class="col-xs-12 col-sm-8" %) ... ... @@ -12,15 +12,15 @@ 12 12 ((( 13 13 (% class="col-xs-12 col-sm-8" %) 14 14 ((( 15 -Zūm Wired is a distributed lighting control system manufactured by Crestron that is set to replace the older Cresnet-based GLPP hardware. It uses industry standard 0-10V, phase dimming, DMX,and DALI protocols to allow for automated control of a building's lighting.14 +Zūm Wired is a distributed lighting control system manufactured by Crestron that is set to replace the older Cresnet-based GLPP hardware. It uses industry standard 0-10V, phase dimming, and DALI protocols to allow for automated control of a building's lighting. 16 16 17 -A Zūm Wired system consists of several devices that are joined on three distinct networks that each use the same cables and connectors as Ethernet. The three networks in a Zūm Wired system that adhereto Ethernet standards are:16 +A Zūm Wired system consists of several devices that are joined on three distinct networks that each use the same cables and connectors as Ethernet. The three networks in a Zūm Wired system are: 18 18 19 19 * Ethernet 20 20 * Zūm Net 21 21 * Zūm Link 22 22 23 -Additionally, traditional 4-wire Cresnet can be wired directly into a Zūm Link network; [[wiring details below>>WebHome||anchor="HZ16BmLinktoCresnet"]]. 22 +Additionally, traditional 4-wire Cresnet can be wired directly into a Zūm Link network; [[wiring details below>>SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HZ16BmLinktoCresnet"]]. 24 24 25 25 = Ethernet = 26 26 ... ... @@ -30,13 +30,13 @@ 30 30 31 31 Zūm Net wiring should adhere to Ethernet cabling standards and use standard RJ-45 connectors. Zūm Net connects networked room-level controllers throughout the building to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices. 32 32 33 -Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable is shown in purple on //[[Figure 1>>WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. 32 +Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable is shown in purple on //[[Figure 1>>SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. 34 34 35 35 ZUMNET-JBOX devices are covered in more detail [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome]]. 36 36 37 37 = Zūm Link = 38 38 39 -Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a room to the ZUMNET-JBOX for that room. Zūm Link cable is shown in orange on //[[Figure 1>>WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm Net devices. Additionally, **do not loop Zūm Link runs back to a Zūm Net device**; each Zūm Link run should originate at an orange Zūm Link port on a Zūm Net device and end at the last Zūm Link device on the run. 38 +Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a room to the ZUMNET-JBOX for that room. Zūm Link cable is shown in orange on //[[Figure 1>>SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm Net devices. Additionally, **do not loop Zūm Link runs back to a Zūm Net device**; each Zūm Link run should originate at an orange Zūm Link port on a Zūm Net device and end at the last Zūm Link device on the run. 40 40 41 41 Links to articles covering specific Zūm Link devices can be found [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.WebHome]]. 42 42 ... ... @@ -59,7 +59,7 @@ 59 59 |(% style="width:87px" %)7|(% style="width:213px" %)Cresnet Y (Data +)|(% style="width:257px" %)White|(% style="width:426px" %)White / Brown 60 60 |(% style="width:87px" %)8|(% style="width:213px" %)Cresnet Z (Data -)|(% style="width:257px" %)Blue|(% style="width:426px" %)Brown 61 61 62 -//[[Figure 2>>WebHome||anchor="HFigure2"]]// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]]. 61 +//[[Figure 2>>SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure2"]]// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]]. 63 63 ))) 64 64 65 65 ... ... @@ -72,13 +72,15 @@ 72 72 (% class="wikigeneratedid" id="HFigure1" %) 73 73 ((( 74 74 [[[[image:wiki_zumwired trans.png]]>>attach:wiki_zumwired trans.png]] 75 -//Figure 1: Overview of a typical Zūm Wired system [[(larger)>> https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumwired%20trans.png?rev=1.2]]//74 +//Figure 1: Overview of a typical Zūm Wired system [[(larger)>>attach:wiki_zumwired trans.png]]// 76 76 ))) 77 77 78 78 (% class="wikigeneratedid" id="HFigure2" %) 79 79 ((( 80 80 [[[[image:wiki_zumlink to cresnet.png||alt="image2.jpg"]]>>attach:wiki_zumlink to cresnet.png]] 81 -//Figure 2: Zūm Link to Cresnet Wiring [[(larger)>> https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumlink%20to%20cresnet.png?rev=1.1]] - white/blue and green wire left bare for illustration purposes only; during actual installation they should be capped and insulated.//80 +//Figure 2: Zūm Link to Cresnet Wiring [[(larger)>>attach:wiki_zumlink to cresnet.png]] - white/blue and green wire left bare for illustration purposes only; during actual installation they should be capped and insulated.// 82 82 ))) 83 83 ))) 84 84 ))) 84 +))) 85 +)))