Changes for page Zūm Wired Wiring Overview
Last modified by Alexander Mott on 2024/03/01 18:46
From version 35.1
edited by Alexander Mott
on 2021/12/23 18:42
on 2021/12/23 18:42
Change comment:
There is no comment for this version
To version 36.1
edited by Alexander Mott
on 2021/12/23 18:45
on 2021/12/23 18:45
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -26,13 +26,13 @@ 26 26 27 27 Zūm Net wiring should adhere to Ethernet cabling standards and use standard RJ-45 connectors. Zūm Net connects networked room-level controllers throughout the building to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices. 28 28 29 -Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //[[Figure 1>>xwiki:Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure1 :OverviewofatypicalZ16BmWiredspaceA028larger29"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices.29 +Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //[[Figure 1>>xwiki:Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure1"]]//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. 30 30 31 31 ZUMNET-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome]]. 32 32 33 33 == Zūm Link == 34 34 35 -Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a a room to the ZUMNET-JBOX for that room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green with orange outline. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm Net devices. Additionally, **do not loop Zūm Link runs back to a Zūm Net device**; each Zūm Link run should originate at an orange Zūm Link port on a Zūm Net device and end at the last Zūm Link device on the run. 35 +Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a a room to the ZUMNET-JBOX for that room. Zūm Link cable and JBOX devices are shown in orange on //[[Figure 1>>xwiki:Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure1"]]//, while Zūm Link keypads are shown in green with orange outline. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm Net devices. Additionally, **do not loop Zūm Link runs back to a Zūm Net device**; each Zūm Link run should originate at an orange Zūm Link port on a Zūm Net device and end at the last Zūm Link device on the run. 36 36 37 37 Links to articles covering specific Zūm Link devices can be found [[here>>doc:Wiring Guide.Zūm Wired System Overview.WebHome]]. 38 38 ... ... @@ -55,19 +55,19 @@ 55 55 |(% style="width:87px" %)7|(% style="width:213px" %)Cresnet Y (Data +)|(% style="width:257px" %)White|(% style="width:426px" %)White / Brown 56 56 |(% style="width:87px" %)8|(% style="width:213px" %)Cresnet Z (Data -)|(% style="width:257px" %)Blue|(% style="width:426px" %)Brown 57 57 58 -//Figure 2// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:Wiring Guide.Wiring Overview.Cresnet.WebHome]]. 58 +//[[Figure 2>>xwiki:Wiring Guide.Wiring Overview.Zūm Net.WebHome||anchor="HFigure2"]]// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:Wiring Guide.Wiring Overview.Cresnet.WebHome]]. 59 59 ))) 60 60 61 61 62 62 (% class="col-xs-12 col-sm-4" %) 63 63 ((( 64 -(% class="wikigeneratedid" id="HFigure1 :OverviewofatypicalZ16BmWiredspaceA028larger29" %)64 +(% class="wikigeneratedid" id="HFigure1" %) 65 65 ((( 66 66 [[[[image:wiki_zumwired trans.png]]>>attach:wiki_zumwired trans.png]] 67 67 //Figure 1: Overview of a typical Zūm Wired space [[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumwired%20trans.png?rev=1.1]]// 68 68 ))) 69 69 70 -(% class="wikigeneratedid" id="HFigure2 :Z16BmLinktoCresnetWiring28larger29-white2Fblueandgreenwireleftbareforillustrationpurposesonly3Bduringactualinstallationtheyshouldbecappedandinsulated." %)70 +(% class="wikigeneratedid" id="HFigure2" %) 71 71 ((( 72 72 [[[[image:wiki_zumlink to cresnet.png||alt="image2.jpg"]]>>attach:wiki_zumlink to cresnet.png]] 73 73 //Figure 2: Zūm Link to Cresnet Wiring [[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumlink%20to%20cresnet.png?rev=1.1]] - white/blue and green wire left bare for illustration purposes only; during actual installation they should be capped and insulated.//