Changes for page Zūm Wired Wiring Overview
Last modified by Alexander Mott on 2024/03/01 18:46
From version 26.1
edited by Alexander Mott
on 2021/12/22 22:54
on 2021/12/22 22:54
Change comment:
There is no comment for this version
To version 12.1
edited by Alexander Mott
on 2021/12/21 23:52
on 2021/12/21 23:52
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
-
Attachments (0 modified, 2 added, 1 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -Zūm Wired 1 +*Zūm Wired - Content
-
... ... @@ -14,53 +14,38 @@ 14 14 15 15 * Ethernet 16 16 * Zūm Net 17 -* Zūm Link 17 +* Zūm Link - each Zūm Link run originates at a ZUMNET-JBOX and connects various Zūm Link devices within a a room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green. 18 18 19 19 In addition to the three networks listed above, there are two additional wiring standards that may be encountered to connect non-Zūm devices to the Zūm Link network, which are covered below under the Zūm Link section 20 20 21 21 == Ethernet == 22 22 23 -Ethernet provides the backbone of the lighting network. Ethernet joins the Hub panels to each other, the processor, and (if the design calls for it) the building LAN. All Ethernet cabling should adhere to the [[Ethernet standards>>doc:Wiring Guide.Wiring Overview.Ethernet.WebHome]] forCrestronsystems.23 +Ethernet provides the backbone of the lighting network. Ethernet joins the Hub panels to each other, the processor, and (if the design calls for it) the building LAN. All Ethernet cabling should adhere to the [[Ethernet standards>>doc:Wiring Guide.Wiring Overview.Ethernet.WebHome]] as covered elsewhere on this wiki. 24 24 25 25 == Zūm Net == 26 26 27 -Zūm Net wiring should adhere to Ethernetcabling standards and use standard RJ-45 connectors.Zūm Net connects networked room-level controllers throughout thebuildingto each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices.27 +Zūm Net connects networked room-level controllers throughout the space to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices. There should be one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1// 28 28 29 -Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMNET-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome]]. 30 - 31 31 == Zūm Link == 32 32 33 - ZūmLink runsoriginate at a ZUMNET-JBOX and connect various Zūm Link devices within a a room to the ZUMNET-JBOX for that room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green with orange outline. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMLINK-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMLINK-JBOX).WebHome]].31 +Lo 34 34 35 35 === Zūm Link to Cresnet === 36 36 37 - While most ZūmLink wiring will adhere to Ethernet cabling standards and utilize standard RJ-45 connectors, Zūm Link is not technically Ethernet. In some situations, it may be necessary to wire traditional Cresnet devices into a Zūm Link space.35 +L 38 38 39 - Inthe future, Crestron will be producing a ZUMLINK-CNRJ45 adapter toallow for plug-and-playconnectionsbetween ZūmLink RJ-45 connectors and 4-wire Cresnet devices. Until this product is available however,it isnecessaryto strip theZūm Link wireandterminate it directly intoa Cresnetphoenix connector or terminal block.37 +=== Non-System Sensor Integration === 40 40 41 -The pin-out to connect a Cresnet device to a Zūm Link network that has been terminated per the T568B standard is as follows: 42 - 43 -(% border="1" style="margin-right:auto" %) 44 -|=(% style="width: 87px;" %)RJ-45 Pin|=(% style="width: 213px;" %)Function|=(% style="width: 257px;" %)Cresnet Color|=(% style="width: 426px;" %)T568-B Color 45 -|(% style="width:87px" %)1|(% style="width:213px" %)24V|(% colspan="1" rowspan="2" style="width:257px" %)Red|(% style="width:426px" %)White / Orange 46 -|(% style="width:87px" %)2|(% style="width:213px" %)24V|(% style="width:426px" %)Orange 47 -|(% style="width:87px" %)3|(% style="width:213px" %)GND|(% colspan="1" rowspan="2" style="width:257px" %)Black|(% style="width:426px" %)White / Green 48 -|(% style="width:87px" %)4|(% style="width:213px" %)GND|(% style="width:426px" %)Blue 49 -|(% style="width:87px" %)5|(% colspan="1" style="width:213px" %)(N/C)|(% colspan="1" style="width:257px" %)(N/C)|(% style="width:426px" %)White / Blue 50 -|(% style="width:87px" %)6|(% colspan="1" style="width:213px" %)(N/C)|(% colspan="1" style="width:257px" %)(N/C)|(% style="width:426px" %)Green 51 -|(% style="width:87px" %)7|(% style="width:213px" %)Cresnet Y (Data +)|(% style="width:257px" %)White|(% style="width:426px" %)White / Brown 52 -|(% style="width:87px" %)8|(% style="width:213px" %)Cresnet Z (Data -)|(% style="width:257px" %)Blue|(% style="width:426px" %)Brown 53 - 54 -//Figure 2// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:Wiring Guide.Wiring Overview.Cresnet.WebHome]]. 39 +L 55 55 ))) 56 56 57 57 58 58 (% class="col-xs-12 col-sm-4" %) 59 59 ((( 60 -[[ [[image:wiki_zumwired trans.png]]>>attach:wiki_zumwired trans.png]]45 +[[image:wiki_zumwired trans.png]] 61 61 //Figure 1: Overview of a typical Zūm Wired space [[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumwired%20trans.png?rev=1.1]]// 62 62 63 -[[ [[image:wiki_zumlinkto cresnet.png||alt="image2.jpg"]]>>attach:wiki_zumlink to cresnet.png]]64 -//Figure 2: Zūm Link to Cresnet Wiring[[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumlink%20to%20cresnet.png?rev=1.1]] - white/blueand green wireleftbare for illustration purposes only; duringactual installation theyshould be cappedand insulated.//48 +[[image:Templates.Article.Template.WebHome@image2.jpg]] 49 +//Figure 2: [[Waves>>https://commons.wikimedia.org/wiki/File:Culebra_-_Playa_de_Flamenco.jpg]]// 65 65 ))) 66 66 )))
- wiki_zumlink to cresnet.png
-
- Author
-
... ... @@ -1,1 +1,0 @@ 1 -XWiki.alexander\.mott@chiefintegrations\.com - Size
-
... ... @@ -1,1 +1,0 @@ 1 -759.1 KB - Content
- image1.jpg
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.MarkKohlmann - Size
-
... ... @@ -1,0 +1,1 @@ 1 +43.8 KB - Content
- image2.jpg
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.MarkKohlmann - Size
-
... ... @@ -1,0 +1,1 @@ 1 +40.0 KB - Content