Summary

Details

Page properties
Content
... ... @@ -14,7 +14,7 @@
14 14  
15 15  * Ethernet
16 16  * Zūm Net
17 -* Zūm Link - each Zūm Link run originates at a ZUMNET-JBOX and connects various Zūm Link devices within a a room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green.
17 +* Zūm Link
18 18  
19 19  In addition to the three networks listed above, there are two additional wiring standards that may be encountered to connect non-Zūm devices to the Zūm Link network, which are covered below under the Zūm Link section
20 20  
... ... @@ -24,15 +24,17 @@
24 24  
25 25  == Zūm Net ==
26 26  
27 -Zūm Net connects networked room-level controllers throughout the space to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices. There should be one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1//
27 +Zūm Net wiring should adhere to Ethernet cabling standards and use standard RJ-45 connectors. Zūm Net connects networked room-level controllers throughout the building to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices.
28 28  
29 +Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMNET-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome]].
30 +
29 29  == Zūm Link ==
30 30  
31 -Lo
33 +Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a a room to the ZUMNET-JBOX for that room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green with orange outline. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMLINK-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMLINK-JBOX).WebHome]].
32 32  
33 33  === Zūm Link to Cresnet ===
34 34  
35 -L
37 +Most Zūm Link wiring will adhere to Ethernet cabling standards, however it is not standard Ethernet.
36 36  
37 37  === Non-System Sensor Integration ===
38 38