Last modified by Alexander Mott on 2024/03/01 18:46

From version 11.2
edited by Alexander Mott
on 2021/12/21 23:52
Change comment: There is no comment for this version
To version 23.1
edited by Alexander Mott
on 2021/12/22 22:30
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -14,7 +14,7 @@
14 14  
15 15  * Ethernet
16 16  * Zūm Net
17 -* Zūm Link - each Zūm Link run originates at a ZUMNET-JBOX and connects various Zūm Link devices within a a room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green.
17 +* Zūm Link
18 18  
19 19  In addition to the three networks listed above, there are two additional wiring standards that may be encountered to connect non-Zūm devices to the Zūm Link network, which are covered below under the Zūm Link section
20 20  
... ... @@ -24,16 +24,35 @@
24 24  
25 25  == Zūm Net ==
26 26  
27 -Zūm Net connects networked room-level controllers throughout the space to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices. There should be one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1//
27 +Zūm Net wiring should adhere to Ethernet cabling standards and use standard RJ-45 connectors. Zūm Net connects networked room-level controllers throughout the building to each other and to the lighting network. Each Zūm Net run will typically originate at a Hub or Processor panel and then connect to a number of ZUMNET-JBOX devices.
28 28  
29 +Typically, there is only one ZUMNET-JBOX per room. Zūm Net cable and devices are shown in purple on //Figure 1//. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMNET-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome]].
30 +
29 29  == Zūm Link ==
30 30  
31 -Lo
33 +Zūm Link runs originate at a ZUMNET-JBOX and connect various Zūm Link devices within a a room to the ZUMNET-JBOX for that room. Zūm Link cable and JBOX devices are shown in orange on //Figure 1//, while Zūm Link keypads are shown in green with orange outline. **It is very important to never connect a Zūm Link cable to a Zūm Net port** as this may damage the Zūm net devices. ZUMLINK-JBOX devices are covered in more detail [[here>>doc:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMLINK-JBOX).WebHome]].
32 32  
33 33  === Zūm Link to Cresnet ===
34 34  
35 -L
37 +While most Zūm Link wiring will adhere to Ethernet cabling standards and utilize standard RJ-45 connectors, Zūm Link is not technically Ethernet. In some situations, it may be necessary to wire traditional Cresnet devices into a Zūm Link space.
36 36  
39 +In the future, Crestron will be producing a ZUMLINK-CNRJ45 adapter to allow for plug-and-play connections between Zūm Link RJ-45 connectors and 4-wire Cresnet devices. Until this product is available however, it is necessary to strip the Zūm Link wire and terminate it directly into a Cresnet phoenix connector or terminal block.
40 +
41 +The pin-out to connect a Cresnet device to a Zūm Link network that has been terminated per the T568B standard is as follows:
42 +
43 +(% border="1" style="margin-right:auto" %)
44 +|(% style="width:130px" %)RJ-45 Pin|(% style="width:271px" %)Function|(% style="width:194px" %)Cresnet Color|(% style="width:426px" %)T568-B Color
45 +|(% style="width:130px" %)1|(% style="width:271px" %)24V|(% colspan="1" rowspan="2" style="width:194px" %)Red|(% style="width:426px" %)White / Orange
46 +|(% style="width:130px" %)2|(% style="width:271px" %)24V|(% style="width:426px" %)Orange
47 +|(% style="width:130px" %)3|(% style="width:271px" %)GND|(% colspan="1" rowspan="2" style="width:194px" %)Black|(% style="width:426px" %)White / Green
48 +|(% style="width:130px" %)4|(% style="width:271px" %)GND|(% style="width:426px" %)Blue
49 +|(% style="width:130px" %)5|(% colspan="1" rowspan="2" style="width:271px" %)N/C|(% colspan="1" rowspan="2" style="width:194px" %)N/C|(% style="width:426px" %)White / Blue
50 +|(% style="width:130px" %)6|(% style="width:426px" %)Green
51 +|(% style="width:130px" %)7|(% style="width:271px" %)Data + (Cresnet Y)|(% style="width:194px" %)White|(% style="width:426px" %)White / Brown
52 +|(% style="width:130px" %)8|(% style="width:271px" %)Data - (Cresnet Z)|(% style="width:194px" %)Blue|(% style="width:426px" %)Brown
53 +
54 +//Figure 2// illustrates how a Zūm Link cable should be terminated at a Cresnet phoenix connector (recall that the standard left-to-right color code for Cresnet wiring is red-white-blue-black). Cresnet wiring is covered in more detail [[here>>doc:Wiring Guide.Wiring Overview.Cresnet.WebHome]].
55 +
37 37  === Non-System Sensor Integration ===
38 38  
39 39  L
... ... @@ -42,10 +42,10 @@
42 42  
43 43  (% class="col-xs-12 col-sm-4" %)
44 44  (((
45 -[[image:wiki_zumwired trans.png]]
64 +[[[[image:wiki_zumwired trans.png]]>>attach:wiki_zumwired trans.png]]
46 46  //Figure 1: Overview of a typical Zūm Wired space [[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumwired%20trans.png?rev=1.1]]//
47 47  
48 -[[image:Templates.Article.Template.WebHome@image2.jpg]]
49 -//Figure 2: [[Waves>>https://commons.wikimedia.org/wiki/File:Culebra_-_Playa_de_Flamenco.jpg]]//
67 +[[[[image:wiki_zumlink to cresnet.png||alt="image2.jpg"]]>>attach:wiki_zumlink to cresnet.png]]
68 +//Figure 2: Zūm Link to Cresnet Wiring [[(larger)>>https://wiki.chiefintegrations.com/download/Wiring%20Guide/Wiring%20Overview/Z%C5%ABm%20Net/WebHome/wiki_zumlink%20to%20cresnet.png?rev=1.1]] - white/blue and green wire left bare for illustration purposes only; during actual installation they should be capped and insulated.//
50 50  )))
51 51  )))
image1.jpg
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.MarkKohlmann
Size
... ... @@ -1,1 +1,0 @@
1 -43.8 KB
Content
image2.jpg
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.MarkKohlmann
Size
... ... @@ -1,1 +1,0 @@
1 -40.0 KB
Content
wiki_zumlink to cresnet.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.alexander\.mott@chiefintegrations\.com
Size
... ... @@ -1,0 +1,1 @@
1 +759.1 KB
Content