Changes for page Processor Setup
Last modified by Alexander Mott on 2024/12/02 19:04
From version 8.1
edited by Alexander Mott
on 2022/06/09 21:45
on 2022/06/09 21:45
Change comment:
There is no comment for this version
To version 9.1
edited by Alexander Mott
on 2022/06/09 22:33
on 2022/06/09 22:33
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -55,7 +55,7 @@ 55 55 * If the job has multiple processors, then these steps must be repeated for all processors on the job 56 56 ** For jobs with Central Control, the IP addresses of the processors matters 57 57 ** Chief Integrations will provide an SRTakeoff.xlsx spreadsheet with an IP Table tab that lists the IP address for each processor. If these IP addresses must be changed during startup, then it will be necessary to also change the IP addresses in the Remote System Definition in the configuration file 58 -** See the[[ CoAP Setup Guide for details>>doc:SHOWRUNNER™ Integrations Guide.Integration Options.CoAP with Crestron S# Library and Modules.CoAP ShowRunner to ShowRunner Setup Instructions.WebHome]]58 +** See the[[ CoAP Setup Guide>>doc:SHOWRUNNER™ Integrations Guide.Integration Options.CoAP with Crestron S# Library and Modules.CoAP ShowRunner to ShowRunner Setup Instructions.WebHome]] for details 59 59 60 60 === Program Load === 61 61