... ... @@ -31,7 +31,6 @@
31 31  
32 32  [[https:~~/~~/www.youtube.com/watch?v=H8CLZ7bp0eI>>url:https://www.youtube.com/watch?v=H8CLZ7bp0eI]]
33 33  
34 -(% class="wikigeneratedid" %)
35 35  = Error Broadcasting =
36 36  
37 37  The first thing that should be done after connecting to a processor is to open the Text Console and run the command: ##broadcast on##
... ... @@ -71,8 +71,8 @@
71 71  ** Connect to the processor via Text Console and run the command: ##startprogafterrouter on##
72 72  *** This will force the processor to wait until the router has started before attempting to load the ShowRunnerCLC™ program, avoiding potential license validation issues if the processor boots up before the router.
73 73  ** The previously listed "ipa," "ipm," etc. commands will configure settings for the processor's LAN port, which should be connected to the building LAN or third party network.
74 -** Lighting control hardware (e.g. TSWs, DIN-CENCN-2s, etc.) should be connected to the Control Subnet port. The processor acts as a DHCP server on the Control Subnet, with addresses that are determined automatically based on the LAN configuration. 
75 -*** Lighting hardware can be connected via the LAN port, however for proper functionality you must run the command: ##securegateway default##
73 +** Lighting control hardware (e.g. TSWs, DIN-CENCN-2s, etc.) should be connected to the Control Subnet port. The processor acts as a DHCP server on the Control Subnet, with addresses that are determined automatically based on the LAN configuration. If lighting hardware is to be connected via the LAN anyway, run the command: ##securegateway default##
74 +*** Note: this setting enables unsecure connections to the processor from the LAN. This is necessary if ZUMNET-JBOXs or other non-secure Crestron devices (such as 3-Series EISC) will be connected via the LAN port of the processor
76 76  ** The Control Subnet will automatically configure itself based on the LAN configuration, but it can optionally be configured manually:
77 77  *** Using the "Functions>Ethernet Addressing...>Control Subnet" menu of Toolbox:
78 78  **** Set routing to "Manual" with the start address and subnet size