Changes for page Processor Setup
Last modified by Alexander Mott on 2024/12/02 19:04
From version 21.1
edited by Alexander Mott
on 2022/06/30 15:27
on 2022/06/30 15:27
Change comment:
There is no comment for this version
To version 14.1
edited by Alexander Mott
on 2022/06/13 15:49
on 2022/06/13 15:49
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Parent
-
... ... @@ -1,1 +1,1 @@ 1 -SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide. SHOWRUNNER™ Installation and Network Setup.WebHome1 +SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.WebHome - Content
-
... ... @@ -1,6 +1,6 @@ 1 1 (% class="box warningmessage" %) 2 2 ((( 3 - SHOWRUNNER™is tested against current Crestron firmware releases. Please use at least the recommended firmware builds.3 +showrunner is tested against current Crestron firmware releases. Please use at least the recommended firmware builds. 4 4 3-Series: PUF 1.8001.0146 5 5 4-Series: PUF 2.7000.00052.01 6 6 VC-4: 2.7000.00047 ... ... @@ -52,7 +52,7 @@ 52 52 ** The Control Subnet can be configured manually in the "Functions>Ethernet Addressing...>Control Subnet" menu of Toolbox 53 53 *** Set routing to "Manual" with the start address and subnet size 54 54 *** E.g., a setting of "10.0.0.0/24" will have the processor at 10.0.0.1 with an IP mask of 255.255.255.0 and a default gateway and DNS server at 10.0.0.2 55 -** The Control Subnet can also be configured to e.g. **10.0.0.0/24**using Text Console command: ##csrouterprefix **10.0.0.0/24**##55 +** The Control Subnet can also be configured to e.g. 10.0.0.0/24 using Text Console command: ##csrouterprefix **10.0.0.0/24**## 56 56 * If the job has multiple processors, then these steps must be repeated for all processors on the job 57 57 ** For jobs with Central Control, the IP addresses of the processors matters 58 58 ** Chief Integrations will provide an SRTakeoff.xlsx spreadsheet with an IP Table tab that lists the IP address for each processor. If these IP addresses must be changed during startup, then it will be necessary to also change the IP addresses in the Remote System Definition in the configuration file ... ... @@ -60,8 +60,8 @@ 60 60 61 61 === Program Load === 62 62 63 -* Download the latest build of SHOWRUNNER™ from the[[ChiefIntegrationsPortal>>https://files.chiefintegrations.com/index.php/s/WHNzXrrZbB5jC3E]]64 -* Connect your computer to the same network as the processor. Make sure your computer’s IP settings are compatible with the lighting network and do not conflict with any devices already on the network 63 +* Download the latest build of SHOWRUNNER™ [[https:~~/~~/files.chiefintegrations.com/s/WHNzXrrZbB5jC3E>>url:https://files.chiefintegrations.com/s/WHNzXrrZbB5jC3E]] 64 +* Connect your computer to the same network as the processor. Make sure your computer’s IP settings are compatible with the lighting network and do not conflict with any devices already on the network. 65 65 ** While it is possible to load the program via USB, it is not recommended because the transfer speed is significantly slower than loading via Ethernet 66 66 * Double click the PUF to open the Package Update Tool and install SHOWRUNNER™ (works best with Toolbox closed) 67 67 ** The Package Update Tool will automatically open your Address Book and prompt you to select a device ... ... @@ -84,9 +84,9 @@ 84 84 *** Click the "Send" button and click "Yes" to upload the program 85 85 *** Once it is done loading, you should be able to run the ##sr ver## command and see the currently installed version of SHOWRUNNER™ 86 86 * Once SHOWRUNNER™ is loaded, you can connect to the UI by navigating to the processor’s IP. A license and configuration file are still required. 87 -** **3-Series processors require authentication enabled** (SSL self can be used but steps will need to be repeated) 88 -** If stuck on "Connecting to Processor" you will need to accept the certificate 89 -* For jobs with multiple processors, SHOWRUNNER™ will need to be loaded to each processor 87 +** **3-Series processors require authentication enabled** (SSL self can be used but steps will need to be repeated). 88 +** If stuck on "Connecting to Processor" you will need to accept the certificate. 89 +* For jobs with multiple processors, SHOWRUNNER™ will need to be loaded to each processor. 90 90 91 91 === License and Configuration Deployment === 92 92 ... ... @@ -111,7 +111,7 @@ 111 111 ***** ##sradmin username "name" administrators password## 112 112 ***** The username and password should be one word each and are the credentials used to log in to the showrunnerHUB™ 113 113 ***** The name can be multiple words as long as it is in quotes, and is simply a friendly name used to identify each user. 114 -*** Once logged in to the showrunnerHUB™ UI, you should be automatically redirected to the File Management page 114 +*** Once logged in to the showrunnerHUB™ UI, you should be automatically redirected to the File Management page. 115 115 **** If you are not automatically redirected, then you can navigate to this page by clicking "Setup" in the top right and then selecting "File Management" from the list on the left 116 116 **** [[image:1654807593390-193.png]] 117 117 **** Under “Upload New License File” ... ... @@ -131,26 +131,3 @@ 131 131 **** Wait for the processor to finish restarting and then reload the page. 132 132 ***** 3-Series processors will take 45 to 90 restart 133 133 ***** 4-Series processors should restart considerably faster 134 - 135 -=== Set System Time === 136 - 137 -It is important for the device clock to be accurate in order for scheduled events to trigger at the appropriate time. If Toolbox is still open, this can be done easily: 138 - 139 -* Connect to the processor via Text Console 140 -* At the top of the Toolbox window, navigate to Functions>System Clock... 141 -* If your computer is in the correct timezone, click Synchronize Device Time with PC 142 -** The Timezone and Device Time should synchronize automatically 143 -** If your PC is in the incorrect Timezone or the time did not synchronize properly, then manually adjust the Time, Date, and Timezone 144 -* Press the Apply button 145 - 146 -Note that the Location given in the System Clock... menu of Toolbox is not used by SHOWRUNNER™. Instead, the location used for sunrise/sunset calculations is stored in the configuration and will typically be set by Chief Integrations prior to delivery of the configuration. Both the location and time can be viewed and edited using the SHOWRUNNER™ UI 147 - 148 -* SHOWRUNNER™ XPanel UI: 149 -** Navigate to Settings>Location and System Clock 150 -** Press the Lock icon to enable editing 151 -** Adjust the time, timezone, and location as necessary 152 -** Press Set System Clock to save the changes 153 -* showrunnerHUB™ Web UI: 154 -** Navigate to Setup>System Settings>Location and System Clock 155 -** Adjust the time, timezone, and location as necessary 156 -** Click Apply to save the changes