Changes for page Pharos Configuration

Last modified by Alexander Mott on 2024/02/26 15:10

From version 1.45
edited by Alexander Mott
on 2023/05/05 21:30
Change comment: (Autosaved)
To version 1.46
edited by Alexander Mott
on 2023/05/05 21:35
Change comment: (Autosaved)

Summary

Details

Page properties
Content
... ... @@ -143,7 +143,18 @@
143 143  
144 144  ShowRunner™ is also capable of triggering Timelines in the Pharos project. This can be configured using the XPanel UI:
145 145  
146 -1. Navigate to Settings > Load Configura
146 +1. Navigate to Settings > Load Hardware
147 +1. Select the Pharos controller from the list of load controllers on the left
148 +1. Press "Configure Scene Tracking"
149 +1. Tick the "Enable Scene Tracking" box to enable scene tracking
150 +1. Select an area whose scenes you want to trigger Timelines from the "Area to Track" list
151 +1*. Note that the area selected does not actually need any loads assigned to it
152 +1*. Pharos fixture groups do not need to be defined as loads in ShowRunner™ at all if scene tracking is being used to control fixtures
153 +1. With the area selected, press "Add New Map"
154 +1. Select the scene you want to trigger the Timeline from the list of scenes
155 +1. Enter the number of the Timeline as defined in the Pharos project in the "Timeline ID" field
156 +1. Click "Add" to add the scene map
157 +1. Map
147 147  
148 148  
149 149  Once scene tracking has been configured for an area, Pharos Timelines will be triggered regardless of whether the individual loads are actually defined in ShowRunner™ or not.