Changes for page Pharos Configuration

Last modified by Alexander Mott on 2024/02/26 15:10

From version 1.30
edited by Alexander Mott
on 2023/05/05 20:09
Change comment: (Autosaved)
To version 1.32
edited by Alexander Mott
on 2023/05/05 20:19
Change comment: (Autosaved)

Summary

Details

Page properties
Content
... ... @@ -93,10 +93,17 @@
93 93  1. Navigate to the "Network" page in Pharos Designer 2
94 94  1. Verify that all online controllers have firmware that matches the version of Pharos Designer 2 you are running, and update them if necessary
95 95  1*. Online controllers are displayed below the list of controllers that are defined in the project
96 -1. Select the controller in the project
96 +1*. If you do not see the controller online and you are hard-wired to the same network as the controller, verify that the controller has the correct IP settings
97 +1*. If the controller is on a Control Subnet and you are connecting via the LAN, [[verify that port forwarding has been configured>>https://wiki.chiefintegrations.com/FAQ/I%20can%27t%20connect%20to%20my%20Pharos%20LPC%20on%20the%20Control%20Subnet]] and proceed to the next step
98 +1*. If you do not see the controller online, but you are connecting to it over a routed network, proceed to the next step
99 +1. Select a controller that is defined in the project
100 +1. In the Properties menu on the right, click the Serial Number dropdown menu and select the SN corresponding to the controller
101 +1*. If you do not see the corresponding serial number, click the "Find..." button
102 +1*. If you are connecting to the controller over a routed network, put the controller's IP address into this field
103 +1*. If you are connecting to a controller on a Control Subnet from the LAN side of the processor, put the processor's LAN IP address followed by a colon and the external port number that corresponds to internal port 38008 of the controller. See our [[FAQ>>https://wiki.chiefintegrations.com/FAQ/I%20can%27t%20connect%20to%20my%20Pharos%20LPC%20on%20the%20Control%20Subnet]] for information
104 +1. If there are multiple controllers in the project, repeat step 6 for all controllers
105 +1. Once all controllers defined in the project have been assigned a serial number, press the "Upload" button
97 97  
98 -If connecting to a Pharos controller located on the Control Subnet of a Crestron processor from the LAN side of the processor, then it is necessary to configure port forwarding on the processor before the project
99 -
100 100  = ShowRunner™ Configuration =
101 101  
102 102  no feedback from dmx