1 This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2
3 More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4
5 Startup Checklist:
6
7 * Before arriving on-site:
8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 * Once on-site:
11 ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
12 ** Configure clock and timezone for processors
13 ** Update firmware for all networked devices
14 ** If necessary, update firmware for Zūm Net and Cresnet devices
15 ** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 ** Load the ShowRunnerCLC™ UI to any touchscreens
17 ** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
19 ** Poll Cresnet and verify devices are online in Toolbox
20 ** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™
21 ** Verify load schedule and fixture functionality
22 *** Toggle each load individually and verify they dim and switch correctly
23 *** Verify loads are assigned to correct areas
24 *** Assign friendly load labels as necessary
25 *** Use the "Verification" checkbox to add a verified timestamp to the load
26 ** Verify occupancy sensors
27 *** Verify correct area assignments
28 *** Adjust timeouts and sensitivities as necessary
29 ** Verify keypad functionality
30 *** Verify correct area assignments
31 *** Verify correct button layouts and functionality
32 ** Verify photocell functionality
33 *** Assign photocells to appropriate lighting zones and enable for required scenes
34 *** Adjust sensitivity as necessary
35 ** Verify partition sensor functionality
36 *** Verify correct area assignments
37 *** Adjust sensitivity as required
38 ** Set up any schedules as required per the sequence of operations
39 ** Complete functionality test (QC, make sure each room functions from an end-user perspective)
40 ** End-user training