1.1 | 1 | This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step. |
2 | |||
3 | More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]]. | ||
4 | |||
5 | Startup Checklist: | ||
6 | |||
7 | * Before arriving on-site: | ||
8 | ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] | ||
9 | ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]] | ||
10 | * Once on-site: | ||
11 | ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.) | ||
12 | ** Configure clock and timezone for processors | ||
13 | ** Update firmware for all networked devices | ||
14 | ** If necessary, update firmware for Zūm Net and Cresnet devices | ||
15 | ** Load SHOWRUNNER™ program to the processor | ||
16 | ** Load the SHOWRUNNER™ UI to any touchscreens | ||
17 | ** Load the SHOWRUNNER™ expansion program to any GLPACs | ||
18 | ** Poll Cresnet and verify devices are online in Toolbox | ||
19 | ** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™ | ||
20 | ** Verify load schedule and fixture functionality | ||
21 | *** Verify loads are assigned to correct areas | ||
22 | *** Verify loads dim and switch correctly | ||
23 | *** Assign friendly load labels as necessary | ||
24 | ** Verify occupancy sensors | ||
25 | *** Verify correct area assignments | ||
26 | *** Adjust timeouts and sensitivities as necessary | ||
27 | ** Verify keypad functionality | ||
28 | *** Verify correct area assignments | ||
29 | *** Verify correct button layouts and functionality | ||
30 | ** Verify photocell functionality | ||
31 | *** Assign photocells to appropriate lighting zones and enable for required scenes | ||
32 | *** Adjust sensitivity as necessary | ||
33 | ** Verify partition sensor functionality | ||
34 | *** Verify correct area assignments | ||
35 | *** Adjust sensitivity as required | ||
36 | ** Set up any schedules as required per the sequence of operations | ||
![]() |
2.1 | 37 | ** Complete functionality test (QC, make sure each room functions from an end-user perspective) |
38 | ** End-user training |