Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 8.1
edited by Alexander Mott
on 2023/12/12 16:30
on 2023/12/12 16:30
Change comment:
There is no comment for this version
To version 9.1
edited by Alexander Mott
on 2023/12/12 16:31
on 2023/12/12 16:31
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -19,9 +19,9 @@ 19 19 *** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it 20 20 ** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox 21 21 ** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™ 22 +*** If necessary, update firmware for any Cresnet and RFID devices 22 22 ** Update firmware for Zūm Net devices 23 23 *** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes 24 -** If necessary, update firmware for any Cresnet and RFID devices 25 25 ** Verify load schedule and fixture functionality 26 26 *** Toggle each load individually and verify they dim and switch correctly 27 27 *** Verify loads are assigned to correct areas