... ... @@ -19,9 +19,9 @@
19 19  *** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it
20 20  ** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox
21 21  ** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™
22 +*** If necessary, update firmware for any Cresnet and RFID devices
22 22  ** Update firmware for Zūm Net devices
23 23  *** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes
24 -** If necessary, update firmware for any Cresnet and RFID devices
25 25  ** Verify load schedule and fixture functionality
26 26  *** Toggle each load individually and verify they dim and switch correctly
27 27  *** Verify loads are assigned to correct areas
... ... @@ -46,6 +46,7 @@
46 46  *** Occupancy/vacancy mode
47 47  *** Occupied/vacant scenes
48 48  *** Scene levels
49 -** Set up any schedules as required per the sequence of operations
50 50  ** Complete functionality test (QC, make sure each room functions from an end-user perspective)
50 +** Set up any schedules as required per the sequence of operations
51 51  ** End-user training
52 +** Make back-ups of all completed configurations