1 -This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
1 +This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2 2  
3 -More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
3 +More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4 4  
5 5  Startup Checklist:
6 6  
7 7  * Before arriving on-site:
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 -** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
9 +** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure authentication settings for networked devices
12 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
13 -** Configure clock and time zone for processors
14 -** Update firmware for all networked devices (excluding Zūm Net devices)
15 -** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 -** Load the ShowRunnerCLC™ UI to any touchscreens
17 -** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 -** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
19 -*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it
20 -** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox
21 -** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™
22 -** Update firmware for Zūm Net devices
23 -*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes
24 -** If necessary, update firmware for any Cresnet and RFID devices
11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
12 +** Configure clock and timezone for processors
13 +** Update firmware for all networked devices
14 +** If necessary, update firmware for Zūm Net and Cresnet devices
15 +** Load SHOWRUNNER™ program to the processor
16 +** Load the SHOWRUNNER™ UI to any touchscreens
17 +** Load the SHOWRUNNER™ expansion program to any GLPACs
18 +** Poll Cresnet and verify devices are online in Toolbox
19 +** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™
25 25  ** Verify load schedule and fixture functionality
26 -*** Toggle each load individually and verify they dim and switch correctly
27 27  *** Verify loads are assigned to correct areas
22 +*** Verify loads dim and switch correctly
28 28  *** Assign friendly load labels as necessary
29 -*** Use the "Verification" checkbox to add a verified timestamp to the load
30 30  ** Verify occupancy sensors
31 31  *** Verify correct area assignments
32 -*** Verify correct direct load assignments if necessary
33 33  *** Adjust timeouts and sensitivities as necessary
34 34  ** Verify keypad functionality
35 35  *** Verify correct area assignments
36 36  *** Verify correct button layouts and functionality
37 -*** Configure keypad actions as necessary
38 38  ** Verify photocell functionality
39 -*** Verify photocells respond to changes in light levels
40 40  *** Assign photocells to appropriate lighting zones and enable for required scenes
41 41  *** Adjust sensitivity as necessary
42 42  ** Verify partition sensor functionality
43 43  *** Verify correct area assignments
44 -*** Adjust sensitivity as required for consistent partition detection
45 -** Configure Area-level sequence of operations
46 -*** Occupancy/vacancy mode
47 -*** Occupied/vacant scenes
48 -*** Scene levels
35 +*** Adjust sensitivity as required
49 49  ** Set up any schedules as required per the sequence of operations
50 -** Complete functionality test (QC, make sure each room functions from an end-user perspective)
51 -** End-user training