... ... @@ -8,16 +8,20 @@
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 9  ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 +** Configure authentication settings for networked devices
11 11  ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
12 -** Configure clock and timezone for processors
13 -** Update firmware for all networked devices
14 -** If necessary, update firmware for Zūm Net and Cresnet devices
13 +** Configure clock and time zone for processors
14 +** Update firmware for all networked devices (excluding Zūm Net devices)
15 15  ** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 16  ** Load the ShowRunnerCLC™ UI to any touchscreens
17 17  ** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 18  ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
19 -** Poll Cresnet and verify devices are online in Toolbox
20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™
19 +*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it
20 +** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox
21 +** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™
22 +*** If necessary, update firmware for any Cresnet and RFID devices
23 +** Update firmware for Zūm Net devices
24 +*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes
21 21  ** Verify load schedule and fixture functionality
22 22  *** Toggle each load individually and verify they dim and switch correctly