Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 7.1
edited by Alexander Mott
on 2023/05/19 16:24
on 2023/05/19 16:24
Change comment:
There is no comment for this version
To version 5.1
edited by Scott Kohlmann
on 2023/04/20 22:44
on 2023/04/20 22:44
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. alexander\.mott@chiefintegrations\.com1 +XWiki.scott\.kohlmann@chiefintegrations\.com - Content
-
... ... @@ -19,29 +19,21 @@ 19 19 ** Poll Cresnet and verify devices are online in Toolbox 20 20 ** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™ 21 21 ** Verify load schedule and fixture functionality 22 -*** Toggle each load individually and verify they dim and switch correctly 23 23 *** Verify loads are assigned to correct areas 23 +*** Verify loads dim and switch correctly 24 24 *** Assign friendly load labels as necessary 25 -*** Use the "Verification" checkbox to add a verified timestamp to the load 26 26 ** Verify occupancy sensors 27 27 *** Verify correct area assignments 28 -*** Verify correct direct load assignments if necessary 29 29 *** Adjust timeouts and sensitivities as necessary 30 30 ** Verify keypad functionality 31 31 *** Verify correct area assignments 32 32 *** Verify correct button layouts and functionality 33 -*** Configure keypad actions as necessary 34 34 ** Verify photocell functionality 35 -*** Verify photocells respond to changes in light levels 36 36 *** Assign photocells to appropriate lighting zones and enable for required scenes 37 37 *** Adjust sensitivity as necessary 38 38 ** Verify partition sensor functionality 39 39 *** Verify correct area assignments 40 -*** Adjust sensitivity as required for consistent partition detection 41 -** Configure Area-level sequence of operations 42 -*** Occupancy/vacancy mode 43 -*** Occupied/vacant scenes 44 -*** Scene levels 36 +*** Adjust sensitivity as required 45 45 ** Set up any schedules as required per the sequence of operations 46 46 ** Complete functionality test (QC, make sure each room functions from an end-user perspective) 47 47 ** End-user training