Changes for page Startup Checklist

Last modified by Alexander Mott on 2024/12/02 19:09

From version 7.1
edited by Alexander Mott
on 2023/05/19 16:24
Change comment: There is no comment for this version
To version 1.1
edited by Alexander Mott
on 2022/06/22 19:49
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,47 +1,36 @@
1 -This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
1 +This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2 2  
3 -More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
3 +More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4 4  
5 5  Startup Checklist:
6 6  
7 7  * Before arriving on-site:
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 -** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
9 +** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
12 12  ** Configure clock and timezone for processors
13 13  ** Update firmware for all networked devices
14 14  ** If necessary, update firmware for Zūm Net and Cresnet devices
15 -** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 -** Load the ShowRunnerCLC™ UI to any touchscreens
17 -** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 -** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
15 +** Load SHOWRUNNER™ program to the processor
16 +** Load the SHOWRUNNER™ UI to any touchscreens
17 +** Load the SHOWRUNNER™ expansion program to any GLPACs
19 19  ** Poll Cresnet and verify devices are online in Toolbox
20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC
19 +** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER
21 21  ** Verify load schedule and fixture functionality
22 -*** Toggle each load individually and verify they dim and switch correctly
23 23  *** Verify loads are assigned to correct areas
22 +*** Verify loads dim and switch correctly
24 24  *** Assign friendly load labels as necessary
25 -*** Use the "Verification" checkbox to add a verified timestamp to the load
26 26  ** Verify occupancy sensors
27 27  *** Verify correct area assignments
28 -*** Verify correct direct load assignments if necessary
29 29  *** Adjust timeouts and sensitivities as necessary
30 30  ** Verify keypad functionality
31 31  *** Verify correct area assignments
32 32  *** Verify correct button layouts and functionality
33 -*** Configure keypad actions as necessary
34 34  ** Verify photocell functionality
35 -*** Verify photocells respond to changes in light levels
36 36  *** Assign photocells to appropriate lighting zones and enable for required scenes
37 37  *** Adjust sensitivity as necessary
38 38  ** Verify partition sensor functionality
39 39  *** Verify correct area assignments
40 -*** Adjust sensitivity as required for consistent partition detection
41 -** Configure Area-level sequence of operations
42 -*** Occupancy/vacancy mode
43 -*** Occupied/vacant scenes
44 -*** Scene levels
35 +*** Adjust sensitivity as required
45 45  ** Set up any schedules as required per the sequence of operations
46 -** Complete functionality test (QC, make sure each room functions from an end-user perspective)
47 -** End-user training