Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 6.1
edited by Alexander Mott
on 2023/05/19 16:21
on 2023/05/19 16:21
Change comment:
There is no comment for this version
To version 8.1
edited by Alexander Mott
on 2023/12/12 16:30
on 2023/12/12 16:30
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -8,16 +8,20 @@ 8 8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] 9 9 ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]] 10 10 * Once on-site: 11 +** Configure authentication settings for networked devices 11 11 ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 12 -** Configure clock and timezone for processors 13 -** Update firmware for all networked devices 14 -** If necessary, update firmware for Zūm Net and Cresnet devices 13 +** Configure clock and time zone for processors 14 +** Update firmware for all networked devices (excluding Zūm Net devices) 15 15 ** Load ShowRunnerCLC™ program, license, and configuration file to the processor 16 16 ** Load the ShowRunnerCLC™ UI to any touchscreens 17 17 ** Load the ShowRunnerCLC™ expansion program to any GLPACs 18 18 ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 19 -** Poll Cresnet and verify devices are online in Toolbox 20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™ 19 +*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it 20 +** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox 21 +** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™ 22 +** Update firmware for Zūm Net devices 23 +*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes 24 +** If necessary, update firmware for any Cresnet and RFID devices 21 21 ** Verify load schedule and fixture functionality 22 22 *** Toggle each load individually and verify they dim and switch correctly 23 23 *** Verify loads are assigned to correct areas ... ... @@ -25,16 +25,23 @@ 25 25 *** Use the "Verification" checkbox to add a verified timestamp to the load 26 26 ** Verify occupancy sensors 27 27 *** Verify correct area assignments 32 +*** Verify correct direct load assignments if necessary 28 28 *** Adjust timeouts and sensitivities as necessary 29 29 ** Verify keypad functionality 30 30 *** Verify correct area assignments 31 31 *** Verify correct button layouts and functionality 37 +*** Configure keypad actions as necessary 32 32 ** Verify photocell functionality 39 +*** Verify photocells respond to changes in light levels 33 33 *** Assign photocells to appropriate lighting zones and enable for required scenes 34 34 *** Adjust sensitivity as necessary 35 35 ** Verify partition sensor functionality 36 36 *** Verify correct area assignments 37 -*** Adjust sensitivity as required 44 +*** Adjust sensitivity as required for consistent partition detection 45 +** Configure Area-level sequence of operations 46 +*** Occupancy/vacancy mode 47 +*** Occupied/vacant scenes 48 +*** Scene levels 38 38 ** Set up any schedules as required per the sequence of operations 39 39 ** Complete functionality test (QC, make sure each room functions from an end-user perspective) 40 40 ** End-user training