Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 6.1
edited by Alexander Mott
on 2023/05/19 16:21
on 2023/05/19 16:21
Change comment:
There is no comment for this version
To version 15.1
edited by Alexander Mott
on 2024/12/02 17:41
on 2024/12/02 17:41
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -8,16 +8,25 @@ 8 8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] 9 9 ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]] 10 10 * Once on-site: 11 +** Configure authentication settings for networked devices 12 +*** **The Crestron Agent and/or Field Tech is responsible for keeping track of any credentials** 13 +*** (% style="color:red" %)**Chief Integrations cannot provide assistance if the credentials are not known** 14 +*** (% style="color:red" %)**If credentials are not known, then the only way to access the device is to do a factory reset, which may require redoing the job start-up** 11 11 ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 12 -** Configure clock and timezone for processors 13 -** Update firmware for all networked devices 14 -** If necessary, update firmware for Zūm Net and Cresnet devices 16 +*** **The Crestron Agent and/or Field Tech is responsible for keeping track of any IP addresses** 17 +*** **Chief Integrations may be able to provide assistance in determining the IP addresses of some devices, but it is not guaranteed** 18 +** Configure clock and time zone for processors 19 +** Update firmware for all networked devices (excluding Zūm Net devices) 15 15 ** Load ShowRunnerCLC™ program, license, and configuration file to the processor 16 16 ** Load the ShowRunnerCLC™ UI to any touchscreens 17 17 ** Load the ShowRunnerCLC™ expansion program to any GLPACs 18 18 ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 19 -** Poll Cresnet and verify devices are online in Toolbox 20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™ 24 +*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it 25 +** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox 26 +** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™ 27 +*** If necessary, update firmware for any Cresnet and RFID devices 28 +** Update firmware for Zūm Net devices 29 +*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes 21 21 ** Verify load schedule and fixture functionality 22 22 *** Toggle each load individually and verify they dim and switch correctly 23 23 *** Verify loads are assigned to correct areas ... ... @@ -25,16 +25,32 @@ 25 25 *** Use the "Verification" checkbox to add a verified timestamp to the load 26 26 ** Verify occupancy sensors 27 27 *** Verify correct area assignments 37 +*** Verify correct direct load assignments if necessary 28 28 *** Adjust timeouts and sensitivities as necessary 29 29 ** Verify keypad functionality 30 30 *** Verify correct area assignments 31 31 *** Verify correct button layouts and functionality 42 +*** Configure keypad actions as necessary 32 32 ** Verify photocell functionality 44 +*** Verify photocells respond to changes in light levels 33 33 *** Assign photocells to appropriate lighting zones and enable for required scenes 34 34 *** Adjust sensitivity as necessary 35 35 ** Verify partition sensor functionality 36 36 *** Verify correct area assignments 37 -*** Adjust sensitivity as required 38 -** Set up any schedules as required per the sequence of operations 49 +*** Adjust sensitivity as required for consistent partition detection 50 +** Configure Area-level sequence of operations 51 +*** Occupancy/vacancy mode 52 +*** Occupied/vacant scenes 53 +*** Scene levels 39 39 ** Complete functionality test (QC, make sure each room functions from an end-user perspective) 55 +** Set up any schedules as required per the sequence of operations 40 40 ** End-user training 57 +* Before leaving the site: 58 +** Save, pull, and back-up any and all configurations 59 +*** If using the Backup feature in ShowRunnerHUB™, be sure to record the secret used when generating the backup. If the secret is lost, it is still possible to retrieve the configuration file but any LWAPI authentication configuration and certain web users will need to be re-created 60 +*** Configurations should be backed up to a git repository, cloud storage, offline storage, or any combination of the previous suggestions. 61 +*** **The Crestron Agent and/or Field Tech is responsible for making copies of the most recent configuration** 62 +*** **Chief Integrations maintains a git repository for all ShowRunnerCLC™ jobs that we ship, and if the end-of-startup configuration is provided then it can be pushed to that repository** 63 +*** (% style="color:red" %)**If the updated configurations are not provided to Chief Integrations, then the only configuration Chief Integrations can provide is the configuration shipped with the job** 64 +** Save a Device Summary using Device Discovery in Crestron Toolbox 65 +** Use Crestron's Information Tool to generate reports for all devices