Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 5.1
edited by Scott Kohlmann
on 2023/04/20 22:44
on 2023/04/20 22:44
Change comment:
There is no comment for this version
To version 8.1
edited by Alexander Mott
on 2023/12/12 16:30
on 2023/12/12 16:30
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. scott\.kohlmann@chiefintegrations\.com1 +XWiki.alexander\.mott@chiefintegrations\.com - Content
-
... ... @@ -8,32 +8,44 @@ 8 8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]] 9 9 ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]] 10 10 * Once on-site: 11 +** Configure authentication settings for networked devices 11 11 ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 12 -** Configure clock and timezone for processors 13 -** Update firmware for all networked devices 14 -** If necessary, update firmware for Zūm Net and Cresnet devices 13 +** Configure clock and time zone for processors 14 +** Update firmware for all networked devices (excluding Zūm Net devices) 15 15 ** Load ShowRunnerCLC™ program, license, and configuration file to the processor 16 16 ** Load the ShowRunnerCLC™ UI to any touchscreens 17 17 ** Load the ShowRunnerCLC™ expansion program to any GLPACs 18 18 ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 19 -** Poll Cresnet and verify devices are online in Toolbox 20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™ 19 +*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it 20 +** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox 21 +** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™ 22 +** Update firmware for Zūm Net devices 23 +*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes 24 +** If necessary, update firmware for any Cresnet and RFID devices 21 21 ** Verify load schedule and fixture functionality 26 +*** Toggle each load individually and verify they dim and switch correctly 22 22 *** Verify loads are assigned to correct areas 23 -*** Verify loads dim and switch correctly 24 24 *** Assign friendly load labels as necessary 29 +*** Use the "Verification" checkbox to add a verified timestamp to the load 25 25 ** Verify occupancy sensors 26 26 *** Verify correct area assignments 32 +*** Verify correct direct load assignments if necessary 27 27 *** Adjust timeouts and sensitivities as necessary 28 28 ** Verify keypad functionality 29 29 *** Verify correct area assignments 30 30 *** Verify correct button layouts and functionality 37 +*** Configure keypad actions as necessary 31 31 ** Verify photocell functionality 39 +*** Verify photocells respond to changes in light levels 32 32 *** Assign photocells to appropriate lighting zones and enable for required scenes 33 33 *** Adjust sensitivity as necessary 34 34 ** Verify partition sensor functionality 35 35 *** Verify correct area assignments 36 -*** Adjust sensitivity as required 44 +*** Adjust sensitivity as required for consistent partition detection 45 +** Configure Area-level sequence of operations 46 +*** Occupancy/vacancy mode 47 +*** Occupied/vacant scenes 48 +*** Scene levels 37 37 ** Set up any schedules as required per the sequence of operations 38 38 ** Complete functionality test (QC, make sure each room functions from an end-user perspective) 39 39 ** End-user training