Content
... ... @@ -19,21 +19,29 @@
19 19  ** Poll Cresnet and verify devices are online in Toolbox
20 20  ** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™
21 21  ** Verify load schedule and fixture functionality
22 +*** Toggle each load individually and verify they dim and switch correctly
22 22  *** Verify loads are assigned to correct areas
23 -*** Verify loads dim and switch correctly
24 24  *** Assign friendly load labels as necessary
25 +*** Use the "Verification" checkbox to add a verified timestamp to the load
25 25  ** Verify occupancy sensors
26 26  *** Verify correct area assignments
28 +*** Verify correct direct load assignments if necessary
27 27  *** Adjust timeouts and sensitivities as necessary
28 28  ** Verify keypad functionality
29 29  *** Verify correct area assignments
30 30  *** Verify correct button layouts and functionality
33 +*** Configure keypad actions as necessary
31 31  ** Verify photocell functionality
35 +*** Verify photocells respond to changes in light levels
32 32  *** Assign photocells to appropriate lighting zones and enable for required scenes
33 33  *** Adjust sensitivity as necessary
34 34  ** Verify partition sensor functionality
35 35  *** Verify correct area assignments
36 -*** Adjust sensitivity as required
40 +*** Adjust sensitivity as required for consistent partition detection
41 +** Configure Area-level sequence of operations
42 +*** Occupancy/vacancy mode
43 +*** Occupied/vacant scenes
44 +*** Scene levels
37 37  ** Set up any schedules as required per the sequence of operations
38 38  ** Complete functionality test (QC, make sure each room functions from an end-user perspective)
39 39  ** End-user training