Changes for page Startup Checklist

Last modified by Alexander Mott on 2024/12/02 19:09

From version 5.1
edited by Scott Kohlmann
on 2023/04/20 22:44
Change comment: There is no comment for this version
To version 3.1
edited by Alexander Mott
on 2022/06/22 20:00
Change comment: Renamed back-links.

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.scott\.kohlmann@chiefintegrations\.com
1 +XWiki.alexander\.mott@chiefintegrations\.com
Content
... ... @@ -1,6 +1,6 @@
1 -This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
1 +This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2 2  
3 -More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
3 +More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4 4  
5 5  Startup Checklist:
6 6  
... ... @@ -8,16 +8,15 @@
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 9  ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
12 12  ** Configure clock and timezone for processors
13 13  ** Update firmware for all networked devices
14 14  ** If necessary, update firmware for Zūm Net and Cresnet devices
15 -** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 -** Load the ShowRunnerCLC™ UI to any touchscreens
17 -** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 -** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
15 +** Load SHOWRUNNER™ program to the processor
16 +** Load the SHOWRUNNER™ UI to any touchscreens
17 +** Load the SHOWRUNNER™ expansion program to any GLPACs
19 19  ** Poll Cresnet and verify devices are online in Toolbox
20 -** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC
19 +** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER
21 21  ** Verify load schedule and fixture functionality
22 22  *** Verify loads are assigned to correct areas
23 23  *** Verify loads dim and switch correctly