Changes for page Startup Checklist
Last modified by Alexander Mott on 2024/12/02 19:09
From version 4.1
edited by Alexander Mott
on 2022/06/22 21:29
on 2022/06/22 21:29
Change comment:
There is no comment for this version
To version 5.1
edited by Scott Kohlmann
on 2023/04/20 22:44
on 2023/04/20 22:44
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. alexander\.mott@chiefintegrations\.com1 +XWiki.scott\.kohlmann@chiefintegrations\.com - Content
-
... ... @@ -1,6 +1,6 @@ 1 -This is a broad-strokes checklist for what needs to be completed by a technician for a S HOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.1 +This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step. 2 2 3 -More detailed specifics and troubleshooting information are available in the [[S HOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].3 +More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]]. 4 4 5 5 Startup Checklist: 6 6 ... ... @@ -12,12 +12,12 @@ 12 12 ** Configure clock and timezone for processors 13 13 ** Update firmware for all networked devices 14 14 ** If necessary, update firmware for Zūm Net and Cresnet devices 15 -** Load S HOWRUNNER™ program, license, and configuration file to the processor16 -** Load the S HOWRUNNER™ UI to any touchscreens17 -** Load the S HOWRUNNER™ expansion program to any GLPACs15 +** Load ShowRunnerCLC™ program, license, and configuration file to the processor 16 +** Load the ShowRunnerCLC™ UI to any touchscreens 17 +** Load the ShowRunnerCLC™ expansion program to any GLPACs 18 18 ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.) 19 19 ** Poll Cresnet and verify devices are online in Toolbox 20 -** Assign Cresnet IDs to devices and verify they are reporting online to S HOWRUNNER™20 +** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™ 21 21 ** Verify load schedule and fixture functionality 22 22 *** Verify loads are assigned to correct areas 23 23 *** Verify loads dim and switch correctly