Changes for page Startup Checklist

Last modified by Alexander Mott on 2024/12/02 19:09

From version 3.1
edited by Alexander Mott
on 2022/06/22 20:00
Change comment: Renamed back-links.
To version 8.1
edited by Alexander Mott
on 2023/12/12 16:30
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,6 +1,6 @@
1 -This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
1 +This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2 2  
3 -More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
3 +More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4 4  
5 5  Startup Checklist:
6 6  
... ... @@ -8,31 +8,44 @@
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 9  ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
12 -** Configure clock and timezone for processors
13 -** Update firmware for all networked devices
14 -** If necessary, update firmware for Zūm Net and Cresnet devices
15 -** Load SHOWRUNNER™ program to the processor
16 -** Load the SHOWRUNNER™ UI to any touchscreens
17 -** Load the SHOWRUNNER™ expansion program to any GLPACs
18 -** Poll Cresnet and verify devices are online in Toolbox
19 -** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™
11 +** Configure authentication settings for networked devices
12 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
13 +** Configure clock and time zone for processors
14 +** Update firmware for all networked devices (excluding Zūm Net devices)
15 +** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 +** Load the ShowRunnerCLC™ UI to any touchscreens
17 +** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 +** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
19 +*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it
20 +** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox
21 +** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™
22 +** Update firmware for Zūm Net devices
23 +*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes
24 +** If necessary, update firmware for any Cresnet and RFID devices
20 20  ** Verify load schedule and fixture functionality
26 +*** Toggle each load individually and verify they dim and switch correctly
21 21  *** Verify loads are assigned to correct areas
22 -*** Verify loads dim and switch correctly
23 23  *** Assign friendly load labels as necessary
29 +*** Use the "Verification" checkbox to add a verified timestamp to the load
24 24  ** Verify occupancy sensors
25 25  *** Verify correct area assignments
32 +*** Verify correct direct load assignments if necessary
26 26  *** Adjust timeouts and sensitivities as necessary
27 27  ** Verify keypad functionality
28 28  *** Verify correct area assignments
29 29  *** Verify correct button layouts and functionality
37 +*** Configure keypad actions as necessary
30 30  ** Verify photocell functionality
39 +*** Verify photocells respond to changes in light levels
31 31  *** Assign photocells to appropriate lighting zones and enable for required scenes
32 32  *** Adjust sensitivity as necessary
33 33  ** Verify partition sensor functionality
34 34  *** Verify correct area assignments
35 -*** Adjust sensitivity as required
44 +*** Adjust sensitivity as required for consistent partition detection
45 +** Configure Area-level sequence of operations
46 +*** Occupancy/vacancy mode
47 +*** Occupied/vacant scenes
48 +*** Scene levels
36 36  ** Set up any schedules as required per the sequence of operations
37 37  ** Complete functionality test (QC, make sure each room functions from an end-user perspective)
38 38  ** End-user training