Summary

Details

Page properties
Content
... ... @@ -1,6 +1,6 @@
1 -This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
1 +This is a broad-strokes checklist for what needs to be completed by a technician for a ShowRunnerCLC™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2 2  
3 -More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
3 +More detailed specifics and troubleshooting information are available in the [[ShowRunnerCLC™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4 4  
5 5  Startup Checklist:
6 6  
... ... @@ -8,19 +8,21 @@
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 9  ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
11 +** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
12 12  ** Configure clock and timezone for processors
13 13  ** Update firmware for all networked devices
14 14  ** If necessary, update firmware for Zūm Net and Cresnet devices
15 -** Load SHOWRUNNER™ program to the processor
16 -** Load the SHOWRUNNER™ UI to any touchscreens
17 -** Load the SHOWRUNNER™ expansion program to any GLPACs
15 +** Load ShowRunnerCLC™ program, license, and configuration file to the processor
16 +** Load the ShowRunnerCLC™ UI to any touchscreens
17 +** Load the ShowRunnerCLC™ expansion program to any GLPACs
18 +** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
18 18  ** Poll Cresnet and verify devices are online in Toolbox
19 -** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER
20 +** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC
20 20  ** Verify load schedule and fixture functionality
22 +*** Toggle each load individually and verify they dim and switch correctly
21 21  *** Verify loads are assigned to correct areas
22 -*** Verify loads dim and switch correctly
23 23  *** Assign friendly load labels as necessary
25 +*** Use the "Verification" checkbox to add a verified timestamp to the load
24 24  ** Verify occupancy sensors
25 25  *** Verify correct area assignments
26 26  *** Adjust timeouts and sensitivities as necessary