Changes for page Startup Checklist

Last modified by Alexander Mott on 2024/12/02 19:09

From version 16.1
edited by Alexander Mott
on 2024/12/02 18:56
Change comment: There is no comment for this version
To version 5.1
edited by Scott Kohlmann
on 2023/04/20 22:44
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.alexander\.mott@chiefintegrations\.com
1 +XWiki.scott\.kohlmann@chiefintegrations\.com
Content
... ... @@ -8,58 +8,32 @@
8 8  ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
9 9  ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
10 10  * Once on-site:
11 -** Configure authentication settings for networked devices
12 -*** **The Crestron Agent and/or Field Tech is responsible for keeping track of any credentials**
13 -*** (% style="color:red" %)**Chief Integrations cannot provide assistance unless the credentials are known**
14 -*** (% style="color:red" %)**If credentials are not known, then the only way to access the device is to do a factory reset, which may require redoing the job start-up**
15 15  ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
16 -*** **The Crestron Agent and/or Field Tech is responsible for keeping track of any IP addresses**
17 -*** **Chief Integrations may be able to provide assistance in determining the IP addresses of some devices, but it is not guaranteed**
18 -** Configure clock and time zone for processors
19 -** Update firmware for all networked devices (excluding Zūm Net devices)
12 +** Configure clock and timezone for processors
13 +** Update firmware for all networked devices
14 +** If necessary, update firmware for Zūm Net and Cresnet devices
20 20  ** Load ShowRunnerCLC™ program, license, and configuration file to the processor
21 21  ** Load the ShowRunnerCLC™ UI to any touchscreens
22 22  ** Load the ShowRunnerCLC™ expansion program to any GLPACs
23 23  ** Configure the IP table for any required devices (TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOXs, GLPACs, etc.)
24 -*** Ensure [[SSL Setup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.CEN-GWEXER Setup.WebHome||anchor="HSSLSetup"]] has been performed for devices that require it
25 -** Poll Cresnet/acquire infinetEX devices to gateways and verify devices are online in Toolbox
26 -** Assign Cresnet/RFID IDs to devices and verify they are reporting online to ShowRunnerCLC™
27 -*** If necessary, update firmware for any Cresnet and RFID devices
28 -** Update firmware for Zūm Net devices
29 -*** See [[Zūm Wired specific>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.Updating Firmware.WebHome||anchor="HZ16BmWiredSpecificNotes"]] firmware notes
19 +** Poll Cresnet and verify devices are online in Toolbox
20 +** Assign Cresnet IDs to devices and verify they are reporting online to ShowRunnerCLC™
30 30  ** Verify load schedule and fixture functionality
31 -*** Toggle each load individually and verify they dim and switch correctly
32 32  *** Verify loads are assigned to correct areas
23 +*** Verify loads dim and switch correctly
33 33  *** Assign friendly load labels as necessary
34 -*** Use the "Verification" checkbox to add a verified timestamp to the load
35 35  ** Verify occupancy sensors
36 36  *** Verify correct area assignments
37 -*** Verify correct direct load assignments if necessary
38 38  *** Adjust timeouts and sensitivities as necessary
39 39  ** Verify keypad functionality
40 40  *** Verify correct area assignments
41 41  *** Verify correct button layouts and functionality
42 -*** Configure keypad actions as necessary
43 43  ** Verify photocell functionality
44 -*** Verify photocells respond to changes in light levels
45 45  *** Assign photocells to appropriate lighting zones and enable for required scenes
46 46  *** Adjust sensitivity as necessary
47 47  ** Verify partition sensor functionality
48 48  *** Verify correct area assignments
49 -*** Adjust sensitivity as required for consistent partition detection
50 -** Configure Area-level sequence of operations
51 -*** Occupancy/vacancy mode
52 -*** Occupied/vacant scenes
53 -*** Scene levels
54 -** Complete functionality test (QC, make sure each room functions from an end-user perspective)
36 +*** Adjust sensitivity as required
55 55  ** Set up any schedules as required per the sequence of operations
38 +** Complete functionality test (QC, make sure each room functions from an end-user perspective)
56 56  ** End-user training
57 -* Before leaving the site:
58 -** Save, pull, and back-up any and all configurations
59 -*** If using the Backup feature in ShowRunnerHUB™, be sure to record the secret used when generating the backup. If the secret is lost, it is still possible to retrieve the configuration file but any LWAPI authentication configuration and certain web users will need to be re-created
60 -*** Configurations should be backed up to a git repository, cloud storage, offline storage, or any combination of the previous suggestions.
61 -*** **The Crestron Agent and/or Field Tech is responsible for making copies of the most recent configuration**
62 -*** **Chief Integrations maintains a git repository for all ShowRunnerCLC™ jobs that we ship, and if the end-of-startup configuration is provided then it can be pushed to that repository**
63 -*** (% style="color:red" %)**If the updated configurations are not provided to Chief Integrations, then the only configuration Chief Integrations can provide is the configuration shipped with the job**
64 -** Save a Device Summary using Device Discovery in Crestron Toolbox
65 -** Use Crestron's Information Tool to generate reports for all devices