Changes for page Shades Integrations
Last modified by Alexander Mott on 2024/06/17 18:07
To version 6.1
edited by Alexander Mott
on 2024/06/14 22:20
on 2024/06/14 22:20
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,3 +1,10 @@ 1 +(% class="row" %) 2 +((( 3 +(% class="box infomessage" %) 4 +((( 5 +Note: page is under construction, check back later for updates 6 +))) 7 + 1 1 (% class="col-xs-12 col-sm-8" %) 2 2 ((( 3 3 Controlling shades from ShowRunnerCLC™ is a paid feature that can be purchased either with the initial [[ShowRunnerCLC™ order>>doc:showrunner™ Order Guide.showrunner™ Additional Features.Shades.WebHome]] or added after-the-fact as an additional charge. When shades control or integration is ordered for ShowRunnerCLC™, it is vital to ensure that the BOM includes any required hardware is also ordered. ... ... @@ -85,28 +85,26 @@ 85 85 86 86 == Contact Closure (Relays) == 87 87 88 -ShowRunnerCLC™ can use output relays on Crestron hardware to control shades provided that the shades controller is capable of accepting a contact closure input for third-party control of the shades. All contact closure shade integrations are assumed to use two relays per shade zone with standard outputs as follows:95 +ShowRunnerCLC™ can use output relays on Crestron hardware to control shades provided that the shades controller is capable of accepting a contact closure input for third-party control of the shades. 89 89 90 -* Open: close relay 1 91 -* Close: close relay 2 92 -* Stop: close both relays simultaneously 93 - 94 -Shade motors must be wired accordingly by the EC or the shades contractor (Chief Integrations technicians do not touch wiring). If the shades interfaces cannot be controlled this way, contact Chief Integrations to see about possibilities for support for shade controls using either a single relay or three or more relays per zone. 95 - 96 96 === Hardware Requirements === 97 97 98 -* Crestron devices with output relays must be specified (refer to [[theabove table>>doc:SHOWRUNNER™Integrations Guide.Integration Options.Shades Integrations.WebHome||anchor="HCommonIntegrationMethods"]]for commonly specified hardware)99 +* Crestron devices with output relays must be specified (refer to table above for commonly specified hardware) 99 99 * Two Crestron output relays must be available for each zone of shades to be controlled 100 100 ** Depending on the shade hardware and the job requirements, it may be possible to combine multiple shades to be controlled together onto a single pair of Crestron relays 101 -* It is recommended that shade interfaces be installed as close as possible to the Crestron relays controlling them to prevent issues from voltage drop or EMF interference in the wiring between the relay and the shade interface 102 +** Contact Chief Integrations if the shades manufacturer specifies either a single or more than two contact closures for third-party integration 103 +* Standard command outputs are as follows: 104 +** Open: close relay 1 105 +** Close: close relay 2 106 +** Stop: close both relays simultaneously 107 +* It is recommended that shade interfaces be installed as close as possible to the Crestron relays controlling them to prevent issues from voltage drop or EMF in the wiring between the relay and the shade interface 102 102 103 103 === Information Requirements === 104 104 105 105 * **(Required)** Quantity and location of Crestron devices to be used for contact closure shade control 106 106 * **(Required)** Quantity and locations of shade zones to be controlled 107 -* **(Required)** Information associating each shade zone with a relay pair 108 -** If C2N-IO or other in-field relay modules are being used, then we must know which shade(s) in which room(s) are controlled by each C2N-IO 109 -** If a processor or other in-panel modules are being used, then we must know which shade(s) in which room(s) are controlled by relays 1 & 2, which are controlled by relays 3 & 4, etc. for each module 113 +* **(Required)** Information associating each shade zone with a pair of relays 114 +** E.g., if a CP4N is being used then we must know which shade(s) in which room(s) are controlled by relays 1 & 2, which shade(s) are controlled by relays 3 & 4, etc. 110 110 111 111 == Draper IntelliFlex I/O A\V Gateway == 112 112 ... ... @@ -125,32 +125,9 @@ 125 125 126 126 == MechoNet Network Interface (MNI) == 127 127 128 -(% class="wikigeneratedid" %) 129 - MechoShade'sMechoNet NetworkInterface(MNI) allows integrating control of MechoNet hardware with third-partysystems suchas ShowRunnerCLC™througha variety ofdifferentmeans. ShowRunnerCLC™ currentlyonlysupportsusing RS-232 or contact closure integrations:reachoutto ChiefIntegrationsforpricingif RS-485orIR integrations arerequired.133 +(% class="wikigeneratedid" id="HMNIRS-232" %) 134 +RS-232 or contact closure integration supported (reach out to Chief Integrations if RS-485 integration is required; contact closure integration is only available if Mecho wall switch ports are not being used) 130 130 131 -=== Hardware Requirements === 132 - 133 -Refer to [[the above table>>doc:SHOWRUNNER™ Integrations Guide.Integration Options.Shades Integrations.WebHome||anchor="HCommonIntegrationMethods"]] for general hardware compatibility. MNI-specific details are below depending on how shades are being integrated: 134 - 135 -* For RS-232 integration: 136 -** One RS-232 port on the ShowRunnerCLC™ system must be available for each MNI to be integrated 137 -** Depending on how the MechoNet system is configured, it is possible that multiple MNI can be controlled through the RS-232 connection at a single MNI 138 -* For contact closure integration: 139 -** Contact closure integration utilizes the MNI switch input ports: **it is not possible to use contact closure integration if Mecho switches are installed to control the shades** 140 -** Two relays must be available for each Mecho motor to be controlled (it is possible to control multiple Mecho motors from a single relay pair provided that the MNI switch ports are wired in parallel) 141 -* For RS-485 or IR integration, reach out to Chief Integrations 142 - 143 -=== Information Requirements === 144 - 145 -Specific information requirements depend on which method of integration is required: 146 - 147 -* **(Required) **Whether integration is being done through RS-232 or contact closures 148 -* For RS-232 integration: 149 -** 150 -* For contact closure integration: 151 -** **(Required)** all information specified in the [[general contact closure>>doc:SHOWRUNNER™ Integrations Guide.Integration Options.Shades Integrations.WebHome||anchor="HInformationRequirements"]] section above 152 -** **(Required)** which shades are controlled by which motor output on each MNI, and which Crestron relays those outputs are expected to correspond to 153 - 154 154 == Mecho SolarTrac4 == 155 155 156 156 (% class="wikigeneratedid" id="HSolarTrac4BACnet" %) ... ... @@ -182,5 +182,4 @@ 182 182 {{toc/}} 183 183 {{/box}} 184 184 ))) 185 - 186 - 167 +)))