Changes for page Shades Integrations

Last modified by Alexander Mott on 2024/06/17 18:07

From version 5.4
edited by Alexander Mott
on 2024/06/14 22:11
Change comment: (Autosaved)
To version 5.5
edited by Alexander Mott
on 2024/06/14 22:16
Change comment: (Autosaved)

Summary

Details

Page properties
Content
... ... @@ -74,7 +74,7 @@
74 74  * TCP/IP communication (including HTTP/HTTPS, TelNet, etc.)
75 75  ** Standard [[Ethernet wiring limitations>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Troubleshooting.Ethernet Wiring Overview.WebHome]] apply
76 76  
77 -Below is a non-exhaustive table showing which pieces of Crestron hardware have interfaces for each kind of integration:
77 +Below is a non-exhaustive table showing which pieces of Crestron hardware have interfaces for each kind of integration (all processors are capable of TCP/IP integration provided the network has been configured correctly):
78 78  
79 79  |=Hardware|=Relay Outputs|=RS-485 Serial Ports|=RS-232 Serial Ports
80 80  |C2N-IO|2|✖|1
... ... @@ -97,8 +97,9 @@
97 97  === Hardware Requirements ===
98 98  
99 99  * Crestron devices with output relays must be specified (refer to table above for commonly specified hardware)
100 -* Two Crestron relays must be available for each zone of shades to be controlled
100 +* Two Crestron output relays must be available for each zone of shades to be controlled
101 101  ** Depending on the shade hardware and the job requirements, it may be possible to combine multiple shades to be controlled together onto a single pair of Crestron relays
102 +** Contact Chief Integrations if the shades manufacturer specifies either more than two contact closures for third-party integration
102 102  * Standard command outputs are as follows:
103 103  ** Open: close relay 1
104 104  ** Close: close relay 2