... ... @@ -134,26 +134,22 @@
134 134  
135 135  * For RS-232 integration:
136 136  ** One RS-232 port on the ShowRunnerCLC™ system must be available for each MNI to be integrated
137 -** Depending on how the MechoNet system is designed, it may be possible to control many shades through a single RS-232 integration provided that any additional MNI and controlled MechoNet hardware is networked together and configured on the MechoNet side
137 +** Depending on how the MechoNet system is configured, it is possible that multiple MNI can be controlled through the RS-232 connection at a single MNI
138 138  * For contact closure integration:
139 139  ** Contact closure integration utilizes the MNI switch input ports: **it is not possible to use contact closure integration if Mecho switches are installed to control the shades**
140 140  ** Two relays must be available for each Mecho motor to be controlled (it is possible to control multiple Mecho motors from a single relay pair provided that the MNI switch ports are wired in parallel)
141 -* For RS-485 or IR integration, reach out to Chief Integrations for potentially adding these integrations
141 +* For RS-485 or IR integration, reach out to Chief Integrations
142 142  
143 143  === Information Requirements ===
144 144  
145 145  Specific information requirements depend on which method of integration is required:
146 146  
147 -* **(Required)** Specify whether integration is being done through RS-232 or contact closures
147 +* **(Required) **Whether integration is being done through RS-232 or contact closures
148 148  * For RS-232 integration:
149 -** **(Required) **MechoNet devices must be addressed so that it is possible to control them per the SOO using their Zone, Group, Node addresses
150 -*** MechoNet devices are assigned three-part Zone, Group, Node addresses similar to an IPv4 address with 3 parts instead of 4
151 -*** e.g. a ZGN address of 128.151.253 represents a device in zone 128, group 151, and node 253
152 -** **(Required) **ZGN addresses must be provided for all shades to be controlled
153 -** **(Required)** location for each shade to be controlled so that they can be assigned to the correct areas in ShowRunnerCLC™
149 +**
154 154  * For contact closure integration:
155 155  ** **(Required)** all information specified in the [[general contact closure>>doc:SHOWRUNNER™ Integrations Guide.Integration Options.Shades Integrations.WebHome||anchor="HInformationRequirements"]] section above
156 -** **(Required)** indicate which Crestron relays correspond to each motor on each MNI, and which shades are controlled by each motor
152 +** **(Required)** which shades are controlled by which motor output on each MNI, and which Crestron relays those outputs are expected to correspond to