Summary

Details

Page properties
Content
... ... @@ -21,12 +21,12 @@
21 21  
22 22  In //[[Figure 1>>WebHome||anchor="HFigure1"]]//, ZUMLINK ports are shown in orange, ZUMNET ports are shown in purple, and the sensor input block is between them.
23 23  
24 -== ZUMNET-JBOX-16A-LV Wiring ==
24 += ZUMNET-JBOX-16A-LV Wiring =
25 25  
26 26  The ZUMNET-JBOX-16A-LV attaches to a standard 4" or 4-11/16" junction box through a 1/2" knockout. High voltage AC and 0-10V dimming splices are made inside of the junction box, while low-voltage Zūm Net, Zūm Link, and non-system sensor connections are made outside of the junction box.
27 27  //[[Figure 2>>WebHome||anchor="HFigure2"]]//
28 28  
29 -== ZUMNET-JBOX-DALI Wiring ==
29 += ZUMNET-JBOX-DALI Wiring =
30 30  
31 31  L
32 32  //[[Figure 3>>WebHome||anchor="HFigure3"]]//
... ... @@ -33,9 +33,9 @@
33 33  
34 34  The official quick start guide from Crestron is available [[here>>attach:mg_qs_zumnet-jbox.pdf]].
35 35  
36 -== Sensor Input Wiring Detail ==
36 += Sensor Input Wiring Detail =
37 37  
38 -Non-system sensors (including Crestron GLS-ODT-C-NS sensors, GLA-LDL photocells, and Steinel occupancy sensors) may be landed at the sensor input terminal block of ZUMNET-JBOX devices. Details on the sensor input wiring can be found [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.Sensor Input Detail (ZUMNET- and ZUMLINK-JBOX).WebHome]].
38 +{{display excludeFirstHeading="true" reference="SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMLINK-JBOX).WebHome" section="HSensorInputWiringDetail"/}}
39 39  )))
40 40  
41 41