Changes for page *ZUMNET-JBOX Load Controllers
Last modified by Alexander Mott on 2024/01/05 18:55
From version 33.2
edited by Alexander Mott
on 2022/03/30 16:17
on 2022/03/30 16:17
Change comment:
Update document after refactoring.
To version 36.1
edited by Alexander Mott
on 2022/03/30 17:02
on 2022/03/30 17:02
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -ZUMNET-JBOX Load Controllers 1 +*ZUMNET-JBOX Load Controllers - Content
-
... ... @@ -19,12 +19,12 @@ 19 19 20 20 It is important to note that while there are two ZUMLINK ports, Zūm Link runs should never be looped back to a ZUMNET-JBOX. Zūm Link runs should originate at a ZUMNET-JBOX, connect to a number of Zūm Link devices, and then stop at the last Zūm Link device. The reason for having multiple ZUMLINK ports is ease of installation; for example, if there are two ZUMLINK-KP keypads in a room, it might be easier to put them at the end of two separate runs so that only one RJ-45 terminated Zūm Link cable needs to be pulled through conduit. 21 21 22 -In //[[Figure 1>> xwiki:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome||anchor="HFigure1"]]//, ZUMLINK ports are shown in orange, ZUMNET ports are shown in purple, and the sensor input block is between them.22 +In //[[Figure 1>>WebHome||anchor="HFigure1"]]//, ZUMLINK ports are shown in orange, ZUMNET ports are shown in purple, and the sensor input block is between them. 23 23 24 24 == ZUMNET-JBOX-16A-LV Wiring == 25 25 26 26 The ZUMNET-JBOX-16A-LV attaches to a standard 4" or 4-11/16" junction box through a 1/2" knockout. High voltage AC and 0-10V dimming splices are made inside of the junction box, while low-voltage Zūm Net, Zūm Link, and non-system sensor connections are made outside of the junction box. 27 -//[[Figure 2>> xwiki:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome||anchor="HFigure2"]]//27 +//[[Figure 2>>WebHome||anchor="HFigure2"]]// 28 28 29 29 The official quick start guide from Crestron is available [[here>>attach:mg_qs_zumnet-jbox.pdf]]. 30 30 ... ... @@ -31,13 +31,13 @@ 31 31 == ZUMNET-JBOX-DALI Wiring == 32 32 33 33 L 34 -//[[Figure 3>> xwiki:Wiring Guide.Zūm Wired System Overview.Load Controllers (ZUMNET-JBOX).WebHome||anchor="HFigure3"]]//34 +//[[Figure 3>>WebHome||anchor="HFigure3"]]// 35 35 36 36 The official quick start guide from Crestron is available [[here>>attach:mg_qs_zumnet-jbox.pdf]]. 37 37 38 38 == Sensor Input Wiring Detail == 39 39 40 -Non-system sensors (including Crestron GLS-ODT-C-NS sensors, GLA-LDL photocells, and Steinel occupancy sensors) may be landed at the sensor input terminal block of ZUMNET-JBOX devices. Details on the sensor input wiring can be found [[here>>doc:Wiring Guide.Zūm Wired System Overview.Sensor Input Detail (ZUMNET- and ZUMLINK-JBOX).WebHome]]. 40 +Non-system sensors (including Crestron GLS-ODT-C-NS sensors, GLA-LDL photocells, and Steinel occupancy sensors) may be landed at the sensor input terminal block of ZUMNET-JBOX devices. Details on the sensor input wiring can be found [[here>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Zūm Wired System Overview.Sensor Input Detail (ZUMNET- and ZUMLINK-JBOX).WebHome]]. 41 41 ))) 42 42 43 43