Changes for page Zūm Discovery
Last modified by Alexander Mott on 2025/04/03 17:35
From version 6.2
edited by Alexander Mott
on 2022/09/22 23:32
on 2022/09/22 23:32
Change comment:
There is no comment for this version
To version 6.1
edited by Alexander Mott
on 2022/09/22 23:12
on 2022/09/22 23:12
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -19,21 +19,14 @@ 19 19 == Notes and Limitations == 20 20 21 21 * SHOWRUNNER™ version 3.014 or newer required 22 -* Zūm Wired firmware version 1.02.10 or greater required 23 -* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery commands 24 -* Cresnet devices landed on Zūm Link will not be discovered (Crestron bug expected to be corrected in a future firmware release) 25 -* One area will be created per ZUMNET-JBOX; if there are more areas than ZUMNET-JBOXs, additional areas must be created manually 22 +* Zūm Wired firmware version 23 +* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery command 26 26 27 -== Steps == 28 - 29 -1. 30 - 31 31 = Zūm Wireless Discovery = 32 32 33 33 == Notes and Limitations == 34 34 35 35 * Processor with SHOWRUNNER™ version 2.190 or newer must be running on the same network as the gateway(s) to be acquired 36 -** For SHOWRUNNER™ versions 3.014 and newer, replace ##sr discover zum## commands with ##sr discover zummesh## 37 37 * ZUM-NETBRIDGES must already be acquired to their respective gateway 38 38 * SHOWRUNNER™ will automatically address any ZUM-NETBRIDGES that do not need have addresses assigned, but will still honor any already addressed devices 39 39 * Disconnect from any RF gateways you may be connected to in Toolbox prior to running the discovery command ... ... @@ -50,7 +50,7 @@ 50 50 51 51 (% class="row" %) 52 52 ((( 53 -== Manual RF Gateway Assignment Instructions==46 +== Manual RF Gateway Assignment == 54 54 55 55 Use this method if you have multiple SHOWRUNNER™ instances on the same network or have gateways used by other Crestron systems. 56 56 ... ... @@ -65,7 +65,7 @@ 65 65 * Once SHOWRUNNER™ has finished restarting type "//sr discover zum false//" and press enter. SHOWRUNNER™ will be able to acquire the loads attached to the Zūm rooms at this point. 66 66 * Once completed SHOWRUNNER™ is now ready for full Zūm control 67 67 68 -== Claim All RF Gateways Instructions==61 +== Claim All RF Gateways == 69 69 70 70 Use this method when you have a single SHOWRUNNER™ instance on a local network with all gateways being used for SHOWRUNNER™. 71 71