Changes for page Zūm Discovery

Last modified by Alexander Mott on 2025/04/03 17:35

From version 6.2
edited by Alexander Mott
on 2022/09/22 23:32
Change comment: There is no comment for this version
To version 6.1
edited by Alexander Mott
on 2022/09/22 23:12
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -19,21 +19,14 @@
19 19  == Notes and Limitations ==
20 20  
21 21  * SHOWRUNNER™ version 3.014 or newer required
22 -* Zūm Wired firmware version 1.02.10 or greater required
23 -* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery commands
24 -* Cresnet devices landed on Zūm Link will not be discovered (Crestron bug expected to be corrected in a future firmware release)
25 -* One area will be created per ZUMNET-JBOX; if there are more areas than ZUMNET-JBOXs, additional areas must be created manually
22 +* Zūm Wired firmware version
23 +* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery command
26 26  
27 -== Steps ==
28 -
29 -1.
30 -
31 31  = Zūm Wireless Discovery =
32 32  
33 33  == Notes and Limitations ==
34 34  
35 35  * Processor with SHOWRUNNER™ version 2.190 or newer must be running on the same network as the gateway(s) to be acquired
36 -** For SHOWRUNNER™ versions 3.014 and newer, replace ##sr discover zum## commands with ##sr discover zummesh##
37 37  * ZUM-NETBRIDGES must already be acquired to their respective gateway
38 38  * SHOWRUNNER™ will automatically address any ZUM-NETBRIDGES that do not need have addresses assigned, but will still honor any already addressed devices
39 39  * Disconnect from any RF gateways you may be connected to in Toolbox prior to running the discovery command
... ... @@ -50,7 +50,7 @@
50 50  
51 51  (% class="row" %)
52 52  (((
53 -== Manual RF Gateway Assignment Instructions ==
46 +== Manual RF Gateway Assignment ==
54 54  
55 55  Use this method if you have multiple SHOWRUNNER™ instances on the same network or have gateways used by other Crestron systems.
56 56  
... ... @@ -65,7 +65,7 @@
65 65  * Once SHOWRUNNER™ has finished restarting type "//sr discover zum false//" and press enter. SHOWRUNNER™ will be able to acquire the loads attached to the Zūm rooms at this point.
66 66  * Once completed SHOWRUNNER™ is now ready for full Zūm control
67 67  
68 -== Claim All RF Gateways Instructions ==
61 +== Claim All RF Gateways ==
69 69  
70 70  Use this method when you have a single SHOWRUNNER™ instance on a local network with all gateways being used for SHOWRUNNER™.
71 71