Changes for page Zūm Discovery

Last modified by Alexander Mott on 2025/04/03 17:35

From version 6.1
edited by Alexander Mott
on 2022/09/22 23:12
Change comment: There is no comment for this version
To version 6.2
edited by Alexander Mott
on 2022/09/22 23:32
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -19,14 +19,21 @@
19 19  == Notes and Limitations ==
20 20  
21 21  * SHOWRUNNER™ version 3.014 or newer required
22 -* Zūm Wired firmware version
23 -* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery command
22 +* Zūm Wired firmware version 1.02.10 or greater required
23 +* Disconnect from any ZUMNET devices you may be connected to in Toolbox prior to running the discovery commands
24 +* Cresnet devices landed on Zūm Link will not be discovered (Crestron bug expected to be corrected in a future firmware release)
25 +* One area will be created per ZUMNET-JBOX; if there are more areas than ZUMNET-JBOXs, additional areas must be created manually
24 24  
27 +== Steps ==
28 +
29 +1.
30 +
25 25  = Zūm Wireless Discovery =
26 26  
27 27  == Notes and Limitations ==
28 28  
29 29  * Processor with SHOWRUNNER™ version 2.190 or newer must be running on the same network as the gateway(s) to be acquired
36 +** For SHOWRUNNER™ versions 3.014 and newer, replace ##sr discover zum## commands with ##sr discover zummesh##
30 30  * ZUM-NETBRIDGES must already be acquired to their respective gateway
31 31  * SHOWRUNNER™ will automatically address any ZUM-NETBRIDGES that do not need have addresses assigned, but will still honor any already addressed devices
32 32  * Disconnect from any RF gateways you may be connected to in Toolbox prior to running the discovery command
... ... @@ -43,7 +43,7 @@
43 43  
44 44  (% class="row" %)
45 45  (((
46 -== Manual RF Gateway Assignment ==
53 +== Manual RF Gateway Assignment Instructions ==
47 47  
48 48  Use this method if you have multiple SHOWRUNNER™ instances on the same network or have gateways used by other Crestron systems.
49 49  
... ... @@ -58,7 +58,7 @@
58 58  * Once SHOWRUNNER™ has finished restarting type "//sr discover zum false//" and press enter. SHOWRUNNER™ will be able to acquire the loads attached to the Zūm rooms at this point.
59 59  * Once completed SHOWRUNNER™ is now ready for full Zūm control
60 60  
61 -== Claim All RF Gateways ==
68 +== Claim All RF Gateways Instructions ==
62 62  
63 63  Use this method when you have a single SHOWRUNNER™ instance on a local network with all gateways being used for SHOWRUNNER™.
64 64