Changes for page Zūm Discovery
Last modified by Alexander Mott on 2025/04/03 17:35
From version 13.1
edited by Alexander Mott
on 2022/10/10 23:33
on 2022/10/10 23:33
Change comment:
There is no comment for this version
To version 14.1
edited by Alexander Mott
on 2022/10/10 23:35
on 2022/10/10 23:35
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -58,6 +58,7 @@ 58 58 1*. This command tells SHOWRUNNER™ to discover all Zūm Link hardware (including the internal ZUMNET-JBOX load controller) on the previously discovered Zūm Net devices and then add corresponding areas, loads, sensors, etc. to the configuration 59 59 1**. One area will be created per ZUMNET-JBOX, and all hardware attached to that ZUMNET-JBOX will be assigned to that area 60 60 1*. This command **does not** bring in Cresnet devices: those must be added to the configuration manually until this issue is fixed in the Zūm Wired firmware 61 +1. If all steps have been performed successfully, then you should be able to use the ##sr show area##, ##sr show load##, ##sr show keypad##, and ##sr show occ## commands to see that the ZUMNET and ZUMLINK hardware has been discovered correctly. 61 61 62 62 = Zūm Wireless Discovery = 63 63