Changes for page Zūm Discovery

Last modified by Alexander Mott on 2025/04/03 17:35

From version 10.1
edited by Alexander Mott
on 2022/10/05 16:18
Change comment: There is no comment for this version
To version 12.1
edited by Alexander Mott
on 2022/10/06 14:25
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -8,8 +8,6 @@
8 8  {{toc/}}
9 9  {{/box}}
10 10  
11 -(% class="row" %)
12 -(((
13 13  If Zūm Wired or Wireless devices have been configured using Crestron's Zūm App, then it is possible to automatically build a SHOWRUNNER™ configuration file using the Zūm Discovery feature that is built into SHOWRUNNER™.
14 14  
15 15  There are certain pre-requisites and limitations when building a SHOWRUNNER™ configuration this way, and it may sometimes be necessary make some adjustments to the final configuration, such as changing keypad types and moving loads between areas.
... ... @@ -53,10 +53,10 @@
53 53  1. Repeat from step 3 until all ZUMNET-JBOXs that are to be controlled by SHOWRUNNER™ have static IP addresses and unique CIDs for any hosted devices
54 54  1. Disconnect from any ZUMNET-JBOXs and then connect to the processor in Toolbox
55 55  1. Run the command: ##sr discover zumnet true false##
56 -1*. This command tells SHOWRUNNER™ to discover all ZUMMNET-JBOXs on the network, configure their IP tables, and then add corresponding areas and loads to the configuration
57 -1*. One area will be created per ZUMNET-JBOX
54 +1*. This command tells SHOWRUNNER™ to discover all ZUMMNET-JBOXs on the network, configure their IP tables, and then add corresponding IP Devices to the configuration
58 58  1. Run the command: ##sr discover zumnet true true##
59 -1*. This command tells SHOWRUNNER™ to discover all Zūm Link hardware on the previously discovered Zūm Net devices
56 +1*. This command tells SHOWRUNNER™ to discover all Zūm Link hardware (including the internal ZUMNET-JBOX load controller) on the previously discovered Zūm Net devices and then add corresponding areas, loads, sensors, etc. to the configuration
57 +1**. One area will be created per ZUMNET-JBOX, and all hardware attached to that ZUMNET-JBOX will be assigned to that area
60 60  1*. This command **does not** bring in Cresnet devices: those must be added to the configuration manually until this issue is fixed in the Zūm Wired firmware
61 61  1. Put all ZUMNET-JBOXs into CNET mode in order to allow full control from SHOWRUNNER™
62 62  1*. Odd behavior may result from conflicts between SHOWRUNNER™ and internal logic if the ZUMNET-JBOXs are not put into CNET mode
... ... @@ -304,4 +304,3 @@
304 304  Removed Loads: 0
305 305  Zum Discovery Finished
306 306  }}}
307 -)))