Wiki source code of Startup Checklist

Version 3.1 by Alexander Mott on 2022/06/22 20:00

Hide last authors
Alexander Mott 1.1 1 This is a broad-strokes checklist for what needs to be completed by a technician for a SHOWRUNNER™ startup. This checklist is not 100% comprehensive and does not go into detail for each step.
2
3 More detailed specifics and troubleshooting information are available in the [[SHOWRUNNER™ Startup Guide>>doc:SHOWRUNNER™ Setup Guide.WebHome]].
4
5 Startup Checklist:
6
7 * Before arriving on-site:
8 ** Ensure you have the [[required tools and software>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Preparing to Go On-Site.WebHome]]
Alexander Mott 3.1 9 ** Ensure the jobsite is meets [[site readiness requirements>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
Alexander Mott 1.1 10 * Once on-site:
11 ** Configure IP settings for networked devices (processors, TSW touch panels, DIN-CENCN-2s, ZUMNET-JBOX, etc.)
12 ** Configure clock and timezone for processors
13 ** Update firmware for all networked devices
14 ** If necessary, update firmware for Zūm Net and Cresnet devices
15 ** Load SHOWRUNNER™ program to the processor
16 ** Load the SHOWRUNNER™ UI to any touchscreens
17 ** Load the SHOWRUNNER™ expansion program to any GLPACs
18 ** Poll Cresnet and verify devices are online in Toolbox
19 ** Assign Cresnet IDs to devices and verify they are reporting online to SHOWRUNNER™
20 ** Verify load schedule and fixture functionality
21 *** Verify loads are assigned to correct areas
22 *** Verify loads dim and switch correctly
23 *** Assign friendly load labels as necessary
24 ** Verify occupancy sensors
25 *** Verify correct area assignments
26 *** Adjust timeouts and sensitivities as necessary
27 ** Verify keypad functionality
28 *** Verify correct area assignments
29 *** Verify correct button layouts and functionality
30 ** Verify photocell functionality
31 *** Assign photocells to appropriate lighting zones and enable for required scenes
32 *** Adjust sensitivity as necessary
33 ** Verify partition sensor functionality
34 *** Verify correct area assignments
35 *** Adjust sensitivity as required
36 ** Set up any schedules as required per the sequence of operations
Alexander Mott 2.1 37 ** Complete functionality test (QC, make sure each room functions from an end-user perspective)
38 ** End-user training