Changes for page Site Readiness Checklist
Last modified by Alexander Mott on 2024/12/02 17:25
From version 4.1
edited by Alexander Mott
on 2024/12/02 17:25
on 2024/12/02 17:25
Change comment:
There is no comment for this version
To version 1.1
edited by Alexander Mott
on 2022/06/22 19:59
on 2022/06/22 19:59
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,4 +1,4 @@ 1 -There are certain requirements that must be met before a S howRunnerCLC™ startup can be completed. It is possible to begin the startup if only certain things are ready, but it will be impossible to finalize programming until all the requirements are met.1 +There are certain requirements that must be met before a SHOWRUNNER™ startup can be completed. It is possible to begin the startup if only certain things are ready, but it will be impossible to finalize programming until all the requirements are met. 2 2 3 3 For the most efficient startup, it is recommended to wait until all requirements are met prior to arriving on-site. On large jobs, there is some merit to having an occasional on-site visit to verify installation progress and catch any installation errors early before they are repeated throughout the entire installation. 4 4 ... ... @@ -7,16 +7,6 @@ 7 7 * Networked control hardware (Cresnet and Zūm Wired devices) should be installed per the submittals 8 8 * Ethernet runs between control and HUB panels should be complete and terminated at the panels 9 9 * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site 10 -* If applicable, building LAN should be up and running and you should be provided all the information required to correctly configure the lighting control devices, including: 11 -** Specific IP addresses or an IP address range for the lighting control system 12 -** Subnet mask 13 -** Default gateway/router IP address 14 -** Any specific hostnames required 10 +* If applicable, building LAN should be up and running 15 15 * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up 16 -* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals 17 -** All loads should be powered up and verified that there are no shorts or tripped breakers 18 -** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification 19 -** Loads should be tested to ensure that they are controlled by the correct modules and outputs 20 -*** Most 0-10V modules have local buttons which can be used to test dimming and switching 21 -*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output 22 -*** DALI modules have buttons which can be used to test dimming control on a per-loop basis 12 +** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification