Changes for page Site Readiness Checklist

Last modified by Alexander Mott on 2023/06/27 16:53

From version 3.1
edited by Alexander Mott
on 2023/06/27 16:53
Change comment: There is no comment for this version
To version 2.1
edited by Scott Kohlmann
on 2023/04/20 22:43
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.alexander\.mott@chiefintegrations\.com
1 +XWiki.scott\.kohlmann@chiefintegrations\.com
Content
... ... @@ -9,10 +9,4 @@
9 9  * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site
10 10  * If applicable, building LAN should be up and running
11 11  * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up
12 -* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals
13 -** All loads should be powered up and verified that there are no shorts or tripped breakers
14 -** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification
15 -** Loads should be tested to ensure that they are controlled by the correct modules and outputs
16 -*** Most 0-10V modules have local buttons which can be used to test dimming and switching
17 -*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output
18 -*** DALI modules have buttons which can be used to test dimming control on a per-loop basis
12 +** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification