Changes for page Site Readiness Checklist
Last modified by Alexander Mott on 2024/12/02 17:25
From version 2.1
edited by Scott Kohlmann
on 2023/04/20 22:43
on 2023/04/20 22:43
Change comment:
There is no comment for this version
To version 4.1
edited by Alexander Mott
on 2024/12/02 17:25
on 2024/12/02 17:25
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. scott\.kohlmann@chiefintegrations\.com1 +XWiki.alexander\.mott@chiefintegrations\.com - Content
-
... ... @@ -7,6 +7,16 @@ 7 7 * Networked control hardware (Cresnet and Zūm Wired devices) should be installed per the submittals 8 8 * Ethernet runs between control and HUB panels should be complete and terminated at the panels 9 9 * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site 10 -* If applicable, building LAN should be up and running 10 +* If applicable, building LAN should be up and running and you should be provided all the information required to correctly configure the lighting control devices, including: 11 +** Specific IP addresses or an IP address range for the lighting control system 12 +** Subnet mask 13 +** Default gateway/router IP address 14 +** Any specific hostnames required 11 11 * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up 12 -** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification 16 +* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals 17 +** All loads should be powered up and verified that there are no shorts or tripped breakers 18 +** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification 19 +** Loads should be tested to ensure that they are controlled by the correct modules and outputs 20 +*** Most 0-10V modules have local buttons which can be used to test dimming and switching 21 +*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output 22 +*** DALI modules have buttons which can be used to test dimming control on a per-loop basis