Changes for page Site Readiness Checklist

Last modified by Alexander Mott on 2024/12/02 17:25

From version 2.1
edited by Scott Kohlmann
on 2023/04/20 22:43
Change comment: There is no comment for this version
To version 4.1
edited by Alexander Mott
on 2024/12/02 17:25
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.scott\.kohlmann@chiefintegrations\.com
1 +XWiki.alexander\.mott@chiefintegrations\.com
Content
... ... @@ -7,6 +7,16 @@
7 7  * Networked control hardware (Cresnet and Zūm Wired devices) should be installed per the submittals
8 8  * Ethernet runs between control and HUB panels should be complete and terminated at the panels
9 9  * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site
10 -* If applicable, building LAN should be up and running
10 +* If applicable, building LAN should be up and running and you should be provided all the information required to correctly configure the lighting control devices, including:
11 +** Specific IP addresses or an IP address range for the lighting control system
12 +** Subnet mask
13 +** Default gateway/router IP address
14 +** Any specific hostnames required
11 11  * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up
12 -** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification
16 +* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals
17 +** All loads should be powered up and verified that there are no shorts or tripped breakers 
18 +** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification
19 +** Loads should be tested to ensure that they are controlled by the correct modules and outputs
20 +*** Most 0-10V modules have local buttons which can be used to test dimming and switching
21 +*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output
22 +*** DALI modules have buttons which can be used to test dimming control on a per-loop basis