Content
... ... @@ -9,4 +9,10 @@
9 9  * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site
10 10  * If applicable, building LAN should be up and running
11 11  * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up
12 -** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification
12 +* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals
13 +** All loads should be powered up and verified that there are no shorts or tripped breakers
14 +** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification
15 +** Loads should be tested to ensure that they are controlled by the correct modules and outputs
16 +*** Most 0-10V modules have local buttons which can be used to test dimming and switching
17 +*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output
18 +*** DALI modules have buttons which can be used to test dimming control on a per-loop basis