Changes for page Site Readiness Checklist
Last modified by Alexander Mott on 2023/06/27 16:53
From version 2.1
edited by Scott Kohlmann
on 2023/04/20 22:43
on 2023/04/20 22:43
Change comment:
There is no comment for this version
To version 3.1
edited by Alexander Mott
on 2023/06/27 16:53
on 2023/06/27 16:53
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. scott\.kohlmann@chiefintegrations\.com1 +XWiki.alexander\.mott@chiefintegrations\.com - Content
-
... ... @@ -9,4 +9,10 @@ 9 9 * Serial numbers for installed devices should be collected and provided to the technician prior to arriving on-site 10 10 * If applicable, building LAN should be up and running 11 11 * All Crestron hardware (processor panels, HUB panels, and load controllers) should be powered up and remain powered up 12 -** Certain load controllers, such as CLX modules, will need their terminal jumpers removed prior to load verification 12 +* All loads (fixtures) should be landed at load controlling modules according to the load schedule in the submittals 13 +** All loads should be powered up and verified that there are no shorts or tripped breakers 14 +** Certain load controllers, such as CLX modules, will need the terminal jumpers removed prior to load verification 15 +** Loads should be tested to ensure that they are controlled by the correct modules and outputs 16 +*** Most 0-10V modules have local buttons which can be used to test dimming and switching 17 +*** Most phase dimming modules have buttons which can be used to cycle through and toggle all the loads one at a time to verify they are on the correct output 18 +*** DALI modules have buttons which can be used to test dimming control on a per-loop basis