Changes for page Pre-Construction Checklist
Last modified by Alexander Mott on 2024/01/05 19:12
From version 6.1
edited by Alexander Mott
on 2022/06/22 20:10
on 2022/06/22 20:10
Change comment:
There is no comment for this version
To version 8.1
edited by Alexander Mott
on 2023/04/21 16:41
on 2023/04/21 16:41
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -2,7 +2,7 @@ 2 2 3 3 Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process. 4 4 5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth S HOWRUNNER™ startups.5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups. 6 6 7 7 Pre-construction topics to cover: 8 8 ... ... @@ -18,9 +18,12 @@ 18 18 *** **Do not** excessively strip back the teal-yellow jacket 19 19 ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet) 20 20 *** **Do** use T568B Pin-Out 21 +*** **Do not** use EZ-style passthrough RJ-45 terminations 21 21 *** **Do not** exceed 100m/328' cable length 22 22 ** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs) 23 -*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length 24 +*** **Do** use T568B Pin-Out 25 +*** **Do not** use EZ-style passthrough RJ-45 terminations 26 +*** **Do not** exceed 100m/328' cable length 24 24 *** **Do not** mix up Zūm Net and Zūm Link cables 25 25 ** Follow the load schedule 26 26 * Serial number collection