... ... @@ -2,7 +2,7 @@
2 2  
3 3  Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process.
4 4  
5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups.
6 6  
7 7  Pre-construction topics to cover:
8 8  
... ... @@ -18,9 +18,12 @@
18 18  *** **Do not** excessively strip back the teal-yellow jacket
19 19  ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)
20 20  *** **Do** use T568B Pin-Out
21 +*** **Do not** use EZ-style passthrough RJ-45 terminations
21 21  *** **Do not** exceed 100m/328' cable length
22 22  ** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs)
23 -*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length
24 +*** **Do** use T568B Pin-Out
25 +*** **Do not** use EZ-style passthrough RJ-45 terminations
26 +*** **Do not** exceed 100m/328' cable length
24 24  *** **Do not** mix up Zūm Net and Zūm Link cables
25 25  ** Follow the load schedule
26 26  * Serial number collection