Last modified by Alexander Mott on 2024/01/05 19:12

From version 6.1
edited by Alexander Mott
on 2022/06/22 20:10
Change comment: There is no comment for this version
To version 4.1
edited by Alexander Mott
on 2022/06/22 20:04
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -4,7 +4,7 @@
4 4  
5 5  Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
6 6  
7 -Pre-construction topics to cover:
7 +Important topics to cover with the electrical contractor prior to startup:
8 8  
9 9  * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]
10 10  ** Do not power up panels until installation is complete and wiring is verified safe to connect
... ... @@ -12,9 +12,8 @@
12 12  *** **Do** check for shorts before landing at the panel
13 13  *** **Do** land the shield with COM at the panel
14 14  *** **Do** splice through and insulate shield in the field
15 -*** **Do** use wire nuts for Cresnet splices
16 -*** **Do not** use lever-nuts for Cresnet splices
17 17  *** **Do not** leave copper showing at terminations
16 +*** **Do not** use lever-nuts (**do** use wire nuts)
18 18  *** **Do not** excessively strip back the teal-yellow jacket
19 19  ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)
20 20  *** **Do** use T568B Pin-Out